SCP-7716 Euclid ~ medium confidence
SCP-7716
Expected annual
$984K
One-time setup
$1.3M
Annual recurring
$971K
Personnel
8
Initial one-time setup is estimated at $1,329,000 driven primarily by room construction, major equipment purchases (HVAC, feedline, surveillance) and an optional on-site incinerator; recurring annual costs are approximately $971,000/yr, driven by staff wages, a large contingency reserve, research and emergency-response retainer.
🏗️ One-Time Capital Costs Total: $1.3M
Incinerator Capital $500K
[#3] Optional on-site industrial incinerator purchase (capital); included as a one-time option within containment program planning.
Equipment $329K
[#2, #4, #9, #13, #18, #23, #24, #25, #26, #28] Capital equipment and installs: HVAC capital components, waste-sorting/feedline conveyors and PPE stations, CCTV/IR install, initial training materials, initial permitting-related capital expenses, signage/interface hardware, monitoring software development (dev costs capitalized), backup generator/electrical hardware, initial ash storage drums/infrastructure, and communication/buddy-system hardware.
Facilities $300K
[#1] Structural construction/retrofit of containment room sized for 800–1,000 m³ including reinforced floor, sealed walls, viewing window and double-airlock entry.
Initial Research And Lab Setup $200K
[#15, #29] Initial research lab buildout and program setup (behavioral/feeding trials, portable imaging access and research consumables).
🔄 Annual Recurring Costs Total: $971K/yr
Staff Wages $380K/yr
[#5, #6, #7] Incremental staffing: security FTEs to enforce two-person rule and rotational alarms, Head Technician + 2 backup technicians, and 2 custodial FTE for feedstock processing.
Contingency Reserve $200K/yr
[#16, #30] Large contingency and escalation reserve for unexpected behavior/scale, short-notice rentals and rapid scale-up needs.
Research And Monitoring $75K/yr
[#15, #29] Ongoing behavioral/physiological research program, specialist time and recurring research consumables/testing related to SCP sapience and feeding trials.
Feedline Staffing And Maintenance $50K/yr
[#4] Ongoing staffing and maintenance for waste-sorting and feedline equipment to prevent prohibited items being fed and to reduce volatility.
Emergency Response Retainer $30K/yr
[#16] Standby contract retainer for heavy equipment, emergency incineration-capable rental and contractor crews for rapid excision/disposal in overflow/breach events.
Insurance And Liability $30K/yr
[#20] Incremental property/environmental liability, worker's comp and third-party liability premium increases due to SCP operations.
Cover Story And Legal $25K/yr
[#19] Legal counsel/PR/cover-story budget and handling inquiries/FOIA related to SCP-7716 (does not include insurance or ethics consultancy which are separate).
Hr Admin Overhead $25K/yr
[#14] HR/admin allocation for audits, counseling, special access management and recordkeeping (0.2–0.5 FTE equivalent).
Supplies And Consumables $20K/yr
[#8] PPE, disposable coveralls, respirators, cleaning chemicals, biohazard bags, disinfectants and routine consumable restocking.
Incineration Contract $20K/yr
[#3] Recurring cost if incineration is contracted (~per-ton fees and transport) instead of purchasing on-site incinerator.
Facilities Maintenance $19K/yr
[#2, #9, #25] HVAC operation and maintenance, surveillance system maintenance, and backup power/fuel/test maintenance.
Regulatory Compliance $15K/yr
[#18] Ongoing emissions testing, permit renewals and environmental consultant fees (recurring testing/renewal portion).
Ethics Board Oversight $15K/yr
[#22] Retained counsel and bioethics panel consults for sapience-related oversight and special legal review.
Compensation Reserve $10K/yr
[#21] Petty fund for replacement of consumed personal property, counseling and small settlements to avoid grievances.
Scheduling Overtime $10K/yr
[#27] Overtime/coverage costs to accommodate SCP requests, shift reassignments and schedule flexibility.
Logistics And Transport $8K/yr
[#17] Waste transport/disposal costs for recyclables/excess ash removal, vehicle fuel and amortization.
Pest Control $8K/yr
[#11] Ongoing pest control contracts, traps, baiting and inspections to prevent secondary health hazards and breaches.
Data Storage And Network $8K/yr
[#10] Continuous high-resolution video and sensor log storage, backups and encrypted retention (30–90 days typical).
Training Refresh $6K/yr
[#13] Annual refresher training on prohibited wording, behavioral protocols, two-person rule and emergency procedures.
Medical Monitoring And Vaccinations $5K/yr
[#12] Occupational health checks, vaccinations and screening for at-risk staff interacting with waste.
Monitoring Software Maintenance $5K/yr
[#24] Ongoing maintenance, hosting and logging tool upkeep for incident logging and audit trails.
Ash Handling And Testing $3K/yr
[#26] Recurring handling, testing and secure storage costs for post-incineration ash.
Communication Systems Maintenance $3K/yr
[#28] Badge system, buddy-system software upkeep and access logging maintenance.
Signage Updates $1K/yr
[#23] Periodic updates to approved signage, scripts, and non-verbal communication tools to avoid triggering language.
Cost Scenarios
📊 Baseline (baseline) $971K/yr
86.0% probability / year
Normal uneventful year with no major incidents: recurring staffing, maintenance, research, contingency retainer and reserves in place; incineration contracted rather than on-site deployment.
routine operations contracted incineration no overflow or breach
🚨 Minor Incident $1.0M/yr
12.0% probability / year +$40K vs baseline
Localized overflow or staff-attraction incident requiring emergency contractor response, short-term clean-up and limited PR/legal actions.
localized overflow single-site excision and incineration limited staff exposure/HR audit
🚨 Major Breach $1.4M/yr
2.0% probability / year +$400K vs baseline
Significant overflow or partial mobility breach requiring heavy equipment, large-scale incineration/disposal, extended contractor mobilization and elevated legal/ethics response.
large-scale overflow mobility/containment compromise extended emergency contractor mobilization
👥 Personnel 8 total
Role Count Notes
Security Officer / MTF Agent 3 Incremental guards to enforce two-person rule and rotational 24/7 alarm coverage; salaries included in staff_wages [#5].
Head Technician / Research Scientist 1 Lead technician (Shahid Bergdorf or equivalent) on-call and available for interactions; salary included in staff_wages [#6].
Research Technician / Behavioral Tech 2 Backup qualified technicians to cover absences and assist with feeding/monitoring; salaries included in staff_wages [#6].
Custodial Personnel 2 Custodial FTEs dedicated to careful feedstock collection, labeling, bin emptying and incinerator prep; salaries included in staff_wages [#7].
📋 Confidence Notes
Analyst notes provide detailed line-item ranges and many optional paths (contract incineration vs on-site purchase, research scope), so estimates are reasonably informed but wide ranges and policy/regulatory variance reduce certainty.
← SCP-7715 ↑ All SCPs SCP-7717 →