SCP-7715
Argus
~
medium confidence
SCP-7715
Expected annual
$2.0M
One-time setup
$15.9M
Annual recurring
$1.8M
Personnel
9
One-time capital costs are dominated by structural remediation, engineered environmental containment, and a large emergency contingency reserve; recurring annual costs are driven by security staff, hazardous waste treatment, specialist consultancy, and ongoing monitoring and maintenance. Baseline setup requires about $15.85M in one-time capital and roughly $1.83M/year to operate in a steady state.
One-Time Capital Costs
Total: $15.9M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal year with routine operations, no containment breaches or major incidents.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$2.1M/yr
Localized pipe burst or small uncontrolled discharge requiring contractor response and extra disposal.
localized_pipe_burst
small_hazardous_discharge
short_term_contractors
🚨
Major Breach
$3.8M/yr
Significant connection to municipal sewer or multiple bursts requiring major sealing, long-term remediation and public liaison.
municipal_connection
extended_remediation
large_scale_disposal
🚨
Catastrophic Breach
$21.8M/yr
Uncontrolled expansion into public infrastructure or large-scale spectral spread requiring demolition, evacuation and mass remediation.
uncontrolled_spread
regional_evacuations
demolition_and_mass_remediation
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#4] 6–8 guard rota including supervisor and rapid response; baseline modeled at 8 personnel. |
| Technician / Specialist (Daily Shooter) | 1 | [#5] Dedicated specialist/technician responsible for the daily lead projectile procedure (baseline: human operator). |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing a reasoned estimate, but many large ranges (site purchase vs lease, turret vs human, and catastrophic tail risks) create material uncertainty and dependence on chosen baseline options.