SCP-7749
Unknown
~
medium confidence
SCP-7749
Expected annual
$7.6M
One-time setup
$44.0M
Annual recurring
$7.0M
Personnel
35
Estimated immediate one-time capital expenditures of approximately $44,000,000, driven primarily by construction of a large reinforced containment chamber, a fixed reality-anchor installation, replacement SRAs, robotics and initial R&D. Annual recurring operating costs are estimated at roughly $7,000,000/yr, driven by staff wages, ongoing R&D/monitoring, power/HVAC, maintenance, and contingency reserves.
One-Time Capital Costs
Total: $44.0M
Annual Recurring Costs
Total: $7.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.0M/yr
Normal year with no major equipment losses or containment incidents; routine operations, staffing, maintenance, and planned R&D continue.
normal_operations
scheduled_research
routine_maintenance
🚨
Minor Incident
$7.6M/yr
Localized equipment loss or sensor/robotic damage requiring emergency replacement and modest cleanup (e.g., one portable SRA or a sensor array damaged).
single_sra_destruction
sensor_array_loss
robotic_failure
🚨
Major Equipment Loss
$12.0M/yr
Significant containment-support equipment destroyed (multiple SRAs, robotic systems, or transport lockers), requiring major replacement and accelerated R&D/testing.
multiple_sra_failures
simultaneous_robotic_destruction
major_sensor_loss
🚨
Catastrophic Breach
$32.0M/yr
Large-scale containment failure or exposure requiring site-wide evacuation, reconstruction, mass amnesticization, legal/PR emergency response, and accelerated multi-year R&D scale-up.
site_wide_instability
major_breach_or_exposure
extensive_equipment_loss
Personnel
35 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | [#8] 12 guards (4 per shift × 3 shifts) plus 2 shift supervisors to provide 24/7 coverage; salaries + benefits budgeted per analyst note. |
| Research Scientist | 8 | [#9] Senior lead(s) + senior researchers + junior researchers (mix totalling 8 scientific staff included in scientific team budget). |
| Postdoc / Analyst | 2 | [#9] Postdocs/analysts supporting R&D and data analysis; counted separately from senior/junior scientists. |
| Engineer / Maintenance | 3 | [#10] Systems engineers / electrical / HVAC specialists (2–4 engineers recommended; midpoint used). |
| Technician | 4 | [#10] Robotics and maintenance technicians (3–5 technicians recommended; midpoint used). |
| Monitoring / Control Room Operator | 4 | [#11] 24/7 monitoring operators for sensors and control consoles (staffing sized to cover shifts; budgeted separately). |
Confidence Notes
Estimates are midpoints derived from analyst-provided ranges; many high-cost line items (SRAs, fixed anchor, contingency) have wide ranges and optional mitigation paths, so figures are approximate. Operational behavior of SCP-7749 (equipment destruction frequency) introduces uncertainty.