SCP-7801
Unknown
~
medium confidence
SCP-7801
Expected annual
$7.6M
One-time setup
$36.6M
Annual recurring
$7.3M
Personnel
22
One-time capital fit-out dominated by structural blackout, specialized instrumentation, and a large insurance/contingency reserve (~$36.6M total). Annual operating costs driven by on-site security, specialized research and an on-call MTF readiness posture (~$7.33M/yr).
One-Time Capital Costs
Total: $36.6M
Annual Recurring Costs
Total: $7.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.3M/yr
Routine year with no major incidents: steady-state monitoring, scheduled research, and readiness posture maintained.
no_incident
routine_monitoring
🚨
Minor Incident
$7.8M/yr
Limited accidental exposure or containment disturbance requiring emergency medical response, localized repairs, and short-term increased monitoring.
limited_exposure
emergency_response
medical_treatment
🚨
Major Breach
$12.3M/yr
Significant containment breach or structural failure triggering full MTF deployment, major repairs, extensive forensic work, and replacement of capital equipment.
significant_exposure
site_damage
full_MTF_deployment
🚨
Keter Upgrade
$107.3M/yr
Catastrophic scenario requiring Keter-level escalation: permanent remoteization/quarantine, large-scale relocations, reality-stabilization hardware and global mitigation measures.
loss_of_containment
uncontrolled_reality_disruption
Personnel
22 total
| Role | Count | Notes |
|---|---|---|
| Security Officer | 18 | Armed site guard force (18 guards total to cover 3 shifts + supervisors), matches item #7 staffing assumptions. |
| Research Scientist | 3 | On-site specialized research staff (anomalous physicist, paleoanthropologist/conservator, materials scientist) per item #8. |
| Administrative / Oversight | 1 | Scientific liability/ethics oversight and administrative support included in staff_wages (item #28). |
Confidence Notes
Analyst notes provide detailed line items and ranges enabling a mid-confidence estimate for measurable costs (construction, equipment, staffing). Confidence is reduced by high-uncertainty items (insurance reserve size, Keter-scale responses, frequency of anomalous incidents) and wide ranges in some recurring program budgets.