SCP-7840
Unknown
~
medium confidence
SCP-7840
Expected annual
$1.3M
One-time setup
$500K
Annual recurring
$1.3M
Personnel
11
One-time startup costs are approximately $500,000 driven by containment construction and specialized equipment; recurring annual costs are about $1.29M driven primarily by staff wages, site overhead, and ongoing monitoring/research.
One-Time Capital Costs
Total: $500K
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal uneventful year with routine operations and no major incidents.
routine_monitoring
scheduled_maintenance
🚨
Minor Incident
$1.3M/yr
Small containment incident or localized damage requiring repairs and short-term investigation.
equipment_failure
minor_containment_breach
🚨
Major Breach
$1.8M/yr
Significant breach or violent incident requiring emergency response, major repairs, medical/legal costs, and potential replacement of containment fixtures.
security_failure
violent_assault_or_breach
🚨
Political Exposure
$1.5M/yr
Partial exposure to civilians or local authorities requiring large cover-up, amnestics administration, and PR/legal mitigation.
civilian_exposure
media_attention
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#7] Minimum two-guard coverage per shift; 6 guards recommended to staff three shifts plus relief; salaries/benefits included in staff_wages. |
| Research Scientist (PI) | 1 | [#8] Senior researcher (PI) overseeing behavioral and materials research; salary included in staff_wages. |
| Research Scientist (Junior) | 2 | [#8] Two junior researchers for ongoing study; salaries included in staff_wages. |
| Lab Technician | 1 | [#8] Full-time technician for lab work and experiments; salary included in staff_wages. |
| Data Management / Transcription | 1 | [#15] 0.5–1.0 FTE for continuous recording review/transcription (rounded to 1 FTE); salary included in staff_wages. |
Confidence Notes
Analyst notes provide detailed line-item estimates for most categories, but uncertainty remains in site overhead allocation, incident probabilities, and decommissioning choices which produces moderate confidence.