SCP-7841
Safe
~
medium confidence
SCP-7841-ZA
Expected annual
$2.1M
One-time setup
$4.5M
Annual recurring
$1.8M
Personnel
10.5
One-time setup and rare overseas/operational expenses drive capital costs (~$4.5M), while recurring annual costs are dominated by security, medical and legal/cover operations (~$1.84M/yr). Political/military transfer operations (corridor opening, site clearing, Site Elapse prep) are the largest single risk drivers.
One-Time Capital Costs
Total: $4.5M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal year with no major transfers or breaches; ongoing Site-29 containment, research and cover operations only.
no transfer executed
routine research and monitoring
no major incidents
🚨
Transfer And Site Elapse Preparation
$5.1M/yr
Execution of transfer to Site Elapse including corridor opening, MTF insertion, clearing and Site Elapse prep (one-time capital & operational costs) plus the first-year ramp of Site Elapse operations.
decision to relocate SCP-7841-ZA
Zakosian corridor opening
covert clearing of Site Elapse and MTF ops
🚨
Major Breach And Public Exposure
$3.0M/yr
A major containment breach or exposure requiring emergency response, legal payouts, heightened MTF activity and reputational mitigation.
containment breach
public/legal exposure
emergency termination or costly remediation
Personnel
10.5 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#3] Minimum 2 guards per shift × 3 shifts = 6 guards assigned to Site-29 containment (salaries included in staff_wages). |
| Research Scientist | 2 | [#6] Two research scientists for behavioral/neuro studies (costs included in research_and_monitoring). |
| Lab Technician / Research Tech | 1 | [#6] One technical support staff for experiments and equipment (costs included in research_and_monitoring). |
| Medical Officer / Psychiatrist | 1.5 | [#5] Combined on-site medical & psychiatric support (1.0–1.5 FTE combined; salaries included in staff_wages). |
Confidence Notes
Detailed line-item estimates provided by analyst give moderate confidence in site-level recurring costs (security, research, medical). Large uncertainty remains around political/military items (corridor opening, clearing, international ops) which are highly variable; this lowers overall confidence to medium.