SCP-785
Keter
~
medium confidence
SCP-785
Expected annual
$90.1M
One-time setup
$38.1M
Annual recurring
$76.3M
Personnel
38
Initial one-time setup and capital (Site-23 build-out, fleet, monitoring/software, lab tooling, and contingency reserve) are approximately $38.1M; ongoing annual operations are dominated by recurring per-incident containment costs (quarantine, amnestics, MTF deployments, disposal, media/legal), producing an expected annual budget on the order of $76.3M (baseline) and a long-run expected annual cost ≈ $90.1M given outbreak probabilities.
One-Time Capital Costs
Total: $38.1M
Annual Recurring Costs
Total: $76.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$76.3M/yr
Normal operational year with the analyst-assumed cadence (~12 containment activations/year) and routine fixed costs.
~12 activations/year
standard urban responses
no simultaneous multi-city propagation
🚨
Major Outbreak
$145.6M/yr
Year with substantially elevated activity (approx. double incidents, ~24 activations), requiring proportional scaling of per-incident operations.
rapid multi-site spread
multiple urban-level quarantines
increased MTF deployments
🚨
Catastrophic Propagation
$258.0M/yr
Rare multi-city simultaneous propagation requiring mass mobilization, contingency reserve drawdown, and major legal/settlement actions.
widespread propagation in multiple dense population centers
city-scale simultaneous quarantines
major public/legal exposure requiring reserve usage
Personnel
38 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | [#3] MTF Beta-3 operatives (breaching, quarantine enforcement, security; full-time readiness). |
| MTF Leader | 1 | [#3] Senior leader with specialized clearance (only leader knows full SCP-785-1 title). |
| Research Scientist | 1 | [#12] Overseeing Level 4 researcher responsible for experiments and interviews. |
| Analyst / Legal Ops | 4 | [#2] Dedicated analyst/legal operations team for triage, document requests, and coordination. |
| Medical Officer | 3 | [#6, #13] Medics for MTF deployments and Site-23 medical observation for D-Class; included in recurring staffing costs. |
| Engineer / Maintenance | 2 | [#4, #12] Vehicle/equipment maintenance, Site-23 systems (HVAC, negative-pressure, incineration line). |
| Administrative Staff | 3 | [#2, #20] Logistics, legal liaison, scheduling, and admin support for operations and PR/legal coordination. |
Confidence Notes
Estimates use midpoints and analyst-provided ranges; many major drivers (incident frequency, urban density, political/legal complexity, amnestic mix) are highly variable which limits precision. Core fixed costs are better defined (monitoring, MTF readiness, Site-23), while per-incident costs have wide ranges, so overall confidence is medium.