SCP-7883
Unknown
✓
high confidence
SCP-7883
Expected annual
$98K
One-time setup
$785K
Annual recurring
$94K
Personnel
1
Initial one-time capital of about $785,000 is driven by perimeter fencing, structural stabilization, monitoring and contingency reserves; annual recurring costs (~$93,500/yr) are driven by maintenance, local liaison, monitoring connectivity, periodic missions and small contractor/liaison retainers.
One-Time Capital Costs
Total: $785K
Annual Recurring Costs
Total: $94K/yr
Cost Scenarios
📊
Baseline
(baseline)
$94K/yr
Normal uneventful year with scheduled maintenance, monitoring and amortized mission reserves only.
no unauthorized entry
routine 5-year mission not occurring this year
standard maintenance only
🚨
Minor Incident
$114K/yr
Localized incident or vandalism requiring an ad-hoc mission and repair work.
evidence of trespass or localized structural damage
minor anomalous escalation detected on sensors
🚨
Catastrophic Spectral Discharge
$444K/yr
Major anomalous escalation requiring full rapid-response deployment, large-scale containment/evacuation and use of contingency fund.
spectral discharge reported
widespread anomalous activity requiring full MTF + field lab + evacuations
Personnel
1 total
| Role | Count | Notes |
|---|---|---|
| Regional Liaison / Agent | 1 | 0.2 FTE assignment for coordination, logistics and visits (salary/fringe ~$12,000/yr included in staff_wages). |
Confidence Notes
Analyst notes provide line-item cost estimates and frequencies for each major expenditure; sums are straightforward amortizations. Remaining uncertainty is low given the SCP's low-priority status and explicit mission cadence.