SCP-7961
Standard
~
medium confidence
SCP-7961
Expected annual
$224K
One-time setup
$339K
Annual recurring
$202K
Personnel
4
Estimated one-time startup costs are about $339,000 driven primarily by property acquisition, lab retrofit, specialized instrumentation and a contingency reserve; annual operations are roughly $201,950/year driven by staff wages, ongoing research/monitoring, ARK storage and cover/legal expenses.
One-Time Capital Costs
Total: $339K
Annual Recurring Costs
Total: $202K/yr
Cost Scenarios
📊
Baseline
(baseline)
$202K/yr
Normal operating year with routine monitoring, maintenance, and research; no major incidents or program scale-up.
routine_drone_inspections
standard_research_activities
no breaches or escalations
🚨
Minor Incident
$227K/yr
Minor vandalism, targeted theft, equipment failure, or small localized contamination requiring repair, legal work, and replacement equipment.
camera_or_drone_damage
local tampering
small contamination event
🚨
Programmatic Scaleup
$2.2M/yr
Research reveals global-scale implications or contagious propagation requiring rapid scale-up to multi-site containment and large-scale ecological surveys and farms.
evidence_of_widespread_propagation
discovery_of_large-scale_anomalous_utility
regulatory_exposure requiring overt containment
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 1 | [#15] Performs lab analysis, experiments and supervises greenhouse work; salary portion included in staff_wages. |
| Data Analyst / ARK Staff | 1 | [#23, #7] Reviews footage, archives events, integrates with ARK; salary portion included in staff_wages. |
| Drone Operator / Field Technician | 1 | [#9, #8, #10] Conducts bi-weekly inspections, drone maintenance and sample collection; part-time but counted as one staff slot. |
| Security Officer / Contractor | 1 | [#11] Performs periodic patrols and physical checks; may be contracted but represented in staff_wages estimate. |
Confidence Notes
Analyst notes supplied detailed ranges for nearly every line item and local-context assumptions (SE England), but wide ranges on property acquisition, lab retrofit, specialized instrumentation and contingency create material uncertainty; baseline operational items are better defined.