SCP-7980 Euclid ~ medium confidence
SCP-7980
Expected annual
$80.3M
One-time setup
$1.5B
Annual recurring
$65.1M
Personnel
146
Estimated one-time capital and contingency expenditures total about $1.52 billion driven primarily by a large containment/contingency reserve, engineering contingency and heavy robotics/remote-manipulation procurement; recurring annual operating costs are roughly $65.1M driven by staff wages, robotics maintenance, covert operations and logistics.
🏗️ One-Time Capital Costs Total: $1.5B
Containment Contingency Fund $1.0B
[#19] Reserved fund for catastrophic containment/neutralization scenarios and major international fallout.
Emergency Intervention Engineering $200.0M
[#20] Capital for blast walls, deep boring, grout/injection projects, and large-scale civil works in emergencies.
Decommissioning Reserve $50.0M
[#35] Reserved funds for eventual decommissioning, site remediation and long-term monitoring.
Facilities $40.0M
[#1] Secure site compound: control center, barracks, labs (excluding lab buildout allocated separately), morgue/incinerator hangars, vehicle bays, hardened server room and communications center.
Robotics Procurement $30.0M
[#9] Hardened tethered drones, autonomous rovers, manipulator arms, LiDAR/GPR units and redundancy stock.
Local Resettlement Land Acquisition $25.0M
[#18] Land acquisition, compensation and initial resettlement construction costs.
Contracting Retainer One Time $25.0M
[#33] One-time retainer capacity/initial contracting posture for militaries/heavy industry on-call.
Aircraft Purchase And Hangar $20.0M
[#4] Purchase and hangar fit-out for dedicated helicopter capability (1 aircraft assumed).
Groundworks Initial $20.0M
[#21] Permanent reinforced shafts, elevators, stabilized walkways and staging platform construction.
Remote Manipulation Procurement $17.5M
[#10] Heavy-duty remote manipulators, tele-operated excavation/tunneling heads, specialized repair tooling.
Perimeter Surveillance $15.0M
[#2] Long-range cameras, MWIR/FLIR towers, ground radar, seismic/acoustic/fiber sensors for five-mile perimeter.
Power Generation $11.0M
[#11] Microgrid, diesel/gas generators, fuel farm, UPS/battery banks and critical-power integration.
Initial Research And Lab Setup $10.0M
[#1] On-site BSL-3/BSL-4-equivalent lab buildout and initial lab instrumentation referenced in containment facility note.
Info Control And Legal Initial $10.0M
[#17] Initial covert PR/legal/compensation spend to manage local displacement and complexity (one-time stabilization matters).
Structural Repair Tooling $8.5M
[#22] One-time tooling, specialized materials and biocompatible repair tooling stock.
Armored Vehicles Purchase $7.5M
[#5] Armored personnel carriers / MRAPs and support vehicles initial procurement.
Spare Parts Initial $6.0M
[#32] Initial stockpile of critical spare parts for robotics, sensors, generators and custom tooling.
Medical Facility Setup $5.0M
[#13] On-site medical suite, quarantine ward buildout, short-term sample handling infrastructure.
Mapping Campaign One Time $5.0M
[#25] Single intensive LiDAR/GPR deep-penetration campaign and supporting mobilization (periodic).
Environmental Controls Initial $4.5M
[#12] Dehumidification, HVAC, groundwater mitigation and air handling for subterranean containment.
Data Infrastructure Initial $3.0M
[#16] Hardened servers, secure comms, satellite links and initial digital-forensics tooling.
Morgue Incinerator Setup $2.5M
[#14] High-temperature incinerator and morgue processing facility / hazardous ash handling.
Sample Processing Setup $1.8M
[#24] Forensics/short-hold cold chain storage and rapid analysis infrastructure (48-hour chain).
Translation Project One Time $1.0M
[#26] Special translation/archaeological documentation project and conservation for high-value artifacts.
Lethal Equipment Initial $600K
[#6] Initial stockpile of weapons, ammunition, sniper rifles and non-lethal systems procurement.
Monitoring Equipment $600K
[#7] One-time monitoring software/hardware and telemetry systems for continuous inner-section observation.
Ppe Initial $550K
[#23] Initial stock of specialized PPE, bio-suits, autoclaves and decontamination supplies.
Equipment $0
[]
🔄 Annual Recurring Costs Total: $65.1M/yr
Staff Wages $16.0M/yr
[#3, #7, #8, #13] Salaries and benefits: QRF personnel, observation operators, specialized researchers and core medical staff.
Robotics And Remote Repairs $7.5M/yr
[#9, #10] Repairs, replacements, consumables and spare-actuators for expendable/tethered robotics and remote manipulators.
Contingent Contracting Retainer $5.0M/yr
[#33] Annual retainer / surge-capacity retainment for external heavy industry and military assets.
Covert Monitoring And Counter Goi Ops $5.0M/yr
[#30] Ongoing intelligence operations, undercover assets and cyber-monitoring to suppress external leaks/GOI activity.
Logistics And Transport $4.5M/yr
[#4, #5, #27] Aircraft operations/maintenance (contract/ops), armored vehicle fuel/maintenance, staff rotation travel and lodging.
Cover Story And Legal $4.0M/yr
[#17, #31, #34] Ongoing covert PR, legal ops, payoffs/compensation, publication control and regulatory fees.
Supplies And Consumables $3.8M/yr
[#6, #15, #23, #24, #32] Ammunition replenishment, hazardous waste disposal, PPE replenishment, sample consumables and spare-parts replenishment.
Research And Monitoring $3.3M/yr
[#7, #16, #25, #26] Ongoing data operations, telemetry analysis, routine mapping/GPR surveys and translation/documentation programs.
Facilities Maintenance $3.0M/yr
[#1, #12, #14, #21] General site maintenance: building upkeep, HVAC maintenance, morgue and groundworks maintenance.
Power And Fuel Ops $3.0M/yr
[#11] Fuel, generator maintenance, grid leases and UPS/battery replacement cycles.
Security Training And Hazard Pay $2.0M/yr
[#3] Recurring training, vetting, hazard pay and contractor augmentation for QRF teams.
Structural Repair Ops $2.0M/yr
[#22] Intermittent repair operations, specialized materials and remote repair mission costs.
Perimeter Surveillance Maintenance $1.5M/yr
[#2] Annual maintenance, sensor leases and service for perimeter network.
Red Team Exercises $1.0M/yr
[#29] Annual simulated breach drills, live-fire exercises and failover testing.
Recruitment And Retention Premiums $1.0M/yr
[#8] Recruiting/retention premiums for high-clearance specialized researchers and staff.
Psychological And Vetting $900K/yr
[#28] Counseling, long-term psychological care and vetting/back-channel investigations.
Environmental Energy And Maintenance $800K/yr
[#12] Energy and maintenance costs for dehumidification, HVAC and subterranean environmental controls.
Medical Operational Costs $800K/yr
[#13] Medical supplies, testing, quarantine consumables and short-term holding operations.
Cost Scenarios
📊 Baseline (baseline) $65.1M/yr
84.5% probability / year
Normal operational year with no major incidents; steady-state staffing, maintenance, monitoring and routine research/mapping.
steady_operations no_breaches routine_research
🚨 Minor Incident $79.1M/yr
12.0% probability / year +$14.0M vs baseline
Localized breach or escalation requiring surge response, emergency mapping campaign and elevated covert/legal activity but contained quickly.
localized_breach intensive_mapping_campaign surge_security_response
🚨 Major Breach $315.1M/yr
3.0% probability / year +$250.0M vs baseline
Significant containment failure requiring emergency engineering works, large external contracting, possible resettlement/legal operations and heavy repair campaigns.
core_failure large_scale_escape emergency_engineering_deployment
🚨 Catastrophic Breach $1.3B/yr
0.5% probability / year +$1.2B vs baseline
Catastrophic containment failure or political exposure requiring full contingency fund deployment, national/international response, mass remediation and long-term relocation/legal costs.
core_release international_exposure mass_remediation
👥 Personnel 146 total
Role Count Notes
Security Officer / MTF Agent 80 [#3] QRF rapid-response teams to cover 24/7 perimeter and interception duties; count based on analyst 60–120 range.
Research Scientist 20 [#8] Senior researchers and specialist scientists (xenobiology, archaeology, materials, robotics, linguistics).
Operators / Observation Staff 16 [#7] Continuous inner-section camera/telemetry operators (12–20 in analyst notes).
Engineer / Maintenance 10 [#9, #10, #22] Robotics technicians, remote-manipulation operators and civil engineers for maintenance/repairs.
Medical Officer 6 [#13] On-site medical staff for quarantine, testing and emergency response.
Data Analyst / Forensics 6 [#16] Digital forensics, secure-comm analysts and telemetry analysts.
Pilots / Aviation Crew 4 [#4] Aviation crew for dedicated helicopters / contracted aviation ops.
Administrative Staff 4 [#17, #31] On-site administration, legal liaison and cover-story coordination support.
📋 Confidence Notes
Range-based analyst inputs provide many line-item estimates but large uncertainties exist around geopolitical/resettlement costs, contingency fund sizing, and frequency of breach events. Midpoint selections used for budgeting; confidence medium due to well-described operational needs but wide cost ranges and tail-risk exposures.
← SCP-7979 ↑ All SCPs SCP-7981 →