SCP-7981
Unknown
~
medium confidence
SCP-7981
Expected annual
$4.2M
One-time setup
$9.2M
Annual recurring
$4.1M
Personnel
26
Initial one-time program and containment setup is estimated at $9,150,000 driven by R&D, scalable reserves, and facility conversions; recurring annual operations are estimated at $4,033,625/year driven primarily by staff wages (research, clinical, security), ongoing research/monitoring, and legal/cover-up costs.
One-Time Capital Costs
Total: $9.2M
Annual Recurring Costs
Total: $4.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.1M/yr
Normal operational year with no major incidents; steady-state operations and planned replenishments only.
no major device failures
no public exposures
routine replacements and staffing
🚨
Minor Incident
$4.2M/yr
Localized device failure or small public exposure requiring targeted amnestics/response and extra overtime.
single-unit desynchronization cascade
small number of civilian witnesses
multiple device failures requiring replacement
🚨
Major Breach
$9.0M/yr
Widespread desynchronization/site-wide outbreak or public exposure requiring large-scale emergency response, mass amnestics and rapid R&D/production scale-up.
mass desynchronization
public/media exposure
multi-site spread requiring scale-up
Personnel
26 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 6 | Synthesis/optics/EE/biotech/physicists supporting R&D and ongoing experiments [#2]. |
| Medical Officer / Clinical Staff | 4 | Physician, psychiatrists/psychologists and nurses for acclimatization and monitoring [#5]. |
| Security Officer / MTF Agent | 6 | On-site guards for containment suites, transport security and rapid response teams [#7]. |
| Engineer / Maintenance / Technician | 3 | EE/optics technicians for device upkeep, calibration and firmware updates [#11]. |
| Intel / GoI Liaison Team | 4 | Long-term study and personnel dedicated to GoI negotiation/intel (GoI-1918 investigation) [#19]. |
| Administrative Staff | 3 | Program administration, policy, and containment coordination (overhead allocated here) [#16]. |
Confidence Notes
Estimates are based on detailed analyst line items but many costs (anomalous behavior, scale of spread, and R&D outcomes) are highly uncertain; mid-range selections used where ranges were wide.