SCP-8007 Unknown ~ medium confidence
SCP-8007
Expected annual
$13.2M
One-time setup
$16.9M
Annual recurring
$12.4M
Personnel
63
Estimated one-time capital costs are approximately $16.9M driven by heavy-lift mobilization, contingency retainers/reserves, and lab/field infrastructure; ongoing annual operations are about $12.43M/yr dominated by staff wages, heavy equipment rental/logistics, and helicopter support.
🏗️ One-Time Capital Costs Total: $16.9M
Contingency Retainer One Time $5.0M
[#26] Establishment retainer for contingency rapid-response tactical/air assets (initial retainer establishment).
Contingency Reserve $3.0M
[#28] Insurance/indemnity/contingency reserve fund for public exposure, lawsuits, emergency evacuations.
Heavy Lift Mobilization $2.8M
[#7] One-time heavy-lift logistics and mobilization costs (helilift/CH-47 sorties, road/site work, cranes, platforms).
Initial Research And Lab Setup $1.8M
[#10] Modular BSL-capable mobile field labs, negative-pressure modules, autoclaves, PPE stations and initial lab setup.
Facilities $1.3M
[#1, #9, #27] Secure perimeter construction, initial structural stabilization/shoring, and base-camp/site construction (barracks, platforms, site prep).
Conservation Initial $1.0M
[#29] Initial long-term conservation/stabilization and secure artifact storage setup.
Equipment $960K
[#4, #5, #11, #19, #22] Remote monitoring/sensor array hardware, initial UAV/drone fleet purchase, long-term cold-storage freezers and containers, communications VSAT installation, and initial archival/server hardware.
Geophysical Initial Surveys $600K
[#17] Initial high-resolution geophysical surveys and imaging (GPR/LIDAR/seismic) to map large structures.
Power Generation $450K
[#20] Installation of hybrid power generation and distribution (diesel generators, solar/battery arrays, basic distribution).
Cover Story Setup $100K
[#23] Initial setup of cover-story network, bogus research funding, and PR foundation.
🔄 Annual Recurring Costs Total: $12.4M/yr
Staff Wages $5.6M/yr
[#3, #12, #13, #14, #30] 24/7 security guards (12), scientific staff (~10), field labor/technical crew (~35), medical/occupational health staff (~4), and program management/overhead salaries.
Logistics And Transport $2.3M/yr
[#6, #8] Helicopter support (retainer + flights) and heavy/equipment rental for excavation (monthly rental model).
Research And Monitoring $1.5M/yr
[#16, #17, #18, #21, #10] Environmental monitoring, repeat geophysical surveys, high-resolution remote sensing tasking, per-sample analysis programs, and lab maintenance/certification.
Cover Story And Legal $975K/yr
[#23, #24, #25] Ongoing cover-story funding/PR, local agency cooperation payments/leases, and legal counsel/classified protocol management.
Personnel Rotation And Lodging $500K/yr
[#27] Ongoing travel, lodging, meals, rotation logistics and base-camp operational costs.
Contingency Retainer Annual $500K/yr
[#26] Annual standby/retainer fees for contingency rapid-response capability (post-establishment).
Supplies And Consumables $410K/yr
[#4, #11, #15, #22, #19] Sensor maintenance/comms, LN2/power for freezers, decontamination and hazardous-waste disposal operational costs, archival storage maintenance, and comms service fees.
Power Operations $250K/yr
[#20] Fuel, maintenance, and logistics to sustain onsite power generation (generators/solar upkeep and fuel deliveries).
Uav Operations $200K/yr
[#5] Ongoing UAV/drone operations, pilots, maintenance and data links.
Facilities Maintenance $125K/yr
[#2, #9] Perimeter and site inspection/repairs, and ongoing replacement of shoring/erosion-control materials.
Conservation Maintenance $100K/yr
[#29] Ongoing conservation, stabilization, and storage maintenance for conserved specimens/artifacts.
Cost Scenarios
📊 Baseline (baseline) $12.4M/yr
82.0% probability / year
Normal, uneventful year with regular operations, maintenance, and scheduled research.
no incidents routine maintenance scheduled surveys
🚨 Minor Incident $13.4M/yr
12.0% probability / year +$1.0M vs baseline
Localized containment incident (injury, small exposure, equipment damage) requiring emergency response, overtime, contractor cleanup, and temporary PR/legal activity.
small breach or injury equipment failure localized contamination event
🚨 Major Breach $22.4M/yr
6.0% probability / year +$10.0M vs baseline
Significant containment breach or public exposure requiring large-scale tactical response, major repairs/rebuild, emergency containment, legal settlements, and activation of contingency retainers.
major breach/exposure activation of rapid-response retainer public disclosure / legal action
👥 Personnel 63 total
Role Count Notes
Security Officer / MTF Agent 12 [#3] 24/7 guard coverage at crater rim with hazard pay; used 12 guards for cost estimate.
Research Scientist 10 [#12] Core scientific team (paleontology, geology, biology, radiology) billed as full-time specialists.
Field Technician / Laborer 35 [#13] Excavation operators, riggers, general laborers supporting heavy equipment and sample handling.
Medical Officer 4 [#14] On-site medics/nurses and periodic physician support for occupational health and counseling.
Site Manager / Program Manager 2 [#30] Project management, procurement, logistics coordination, and HQ liaison.
📋 Confidence Notes
Analyst notes provide detailed line items and ranges allowing a reasonable aggregation, but major uncertainties remain around the anomaly's size, activity (eruption/resonance risk), and frequency of high-cost contingencies — hence medium confidence.
← SCP-8006 ↑ All SCPs SCP-8008 →