SCP-8007
Unknown
~
medium confidence
SCP-8007
Expected annual
$13.2M
One-time setup
$16.9M
Annual recurring
$12.4M
Personnel
63
Estimated one-time capital costs are approximately $16.9M driven by heavy-lift mobilization, contingency retainers/reserves, and lab/field infrastructure; ongoing annual operations are about $12.43M/yr dominated by staff wages, heavy equipment rental/logistics, and helicopter support.
One-Time Capital Costs
Total: $16.9M
Annual Recurring Costs
Total: $12.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$12.4M/yr
Normal, uneventful year with regular operations, maintenance, and scheduled research.
no incidents
routine maintenance
scheduled surveys
🚨
Minor Incident
$13.4M/yr
Localized containment incident (injury, small exposure, equipment damage) requiring emergency response, overtime, contractor cleanup, and temporary PR/legal activity.
small breach or injury
equipment failure
localized contamination event
🚨
Major Breach
$22.4M/yr
Significant containment breach or public exposure requiring large-scale tactical response, major repairs/rebuild, emergency containment, legal settlements, and activation of contingency retainers.
major breach/exposure
activation of rapid-response retainer
public disclosure / legal action
Personnel
63 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#3] 24/7 guard coverage at crater rim with hazard pay; used 12 guards for cost estimate. |
| Research Scientist | 10 | [#12] Core scientific team (paleontology, geology, biology, radiology) billed as full-time specialists. |
| Field Technician / Laborer | 35 | [#13] Excavation operators, riggers, general laborers supporting heavy equipment and sample handling. |
| Medical Officer | 4 | [#14] On-site medics/nurses and periodic physician support for occupational health and counseling. |
| Site Manager / Program Manager | 2 | [#30] Project management, procurement, logistics coordination, and HQ liaison. |
Confidence Notes
Analyst notes provide detailed line items and ranges allowing a reasonable aggregation, but major uncertainties remain around the anomaly's size, activity (eruption/resonance risk), and frequency of high-cost contingencies — hence medium confidence.