SCP-8021
Keter
?
low confidence
SCP-8021
Expected annual
$4.5B
One-time setup
$3.4B
Annual recurring
$4.3B
Personnel
1800
Initial capital expenditures are approximately $3.44B one-time, driven by high-spec command facilities, regional containment sites, and large R&D program setup; recurring annual operations are approximately $4.25B/yr, dominated by the nationwide Normative Restoration program, amnestic production, and staffing/security.
One-Time Capital Costs
Total: $3.4B
Annual Recurring Costs
Total: $4.3B/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.3B/yr
Normal year with no major containment incidents; routine ops and scheduled programs only.
routine_operations
scheduled_R&D_and_production
🚨
Minor Incident
$4.7B/yr
Localized containment incident requiring scaled-up decontamination, short-term evacuations, and extra legal/PR response.
localized_contamination
small_site_breach
targeted_evacuations
🚨
Major Breach
$6.4B/yr
Significant containment failure or emergent temporal event requiring nationwide emergency response, large-scale evacuations, and emergency R&D mobilization.
site_breach
widespread_temporal_anomaly
mass_casualties
🚨
Catastrophic Breach
$14.3B/yr
Nationwide or multi-site catastrophic failure requiring sustained emergency mobilization, international intervention, and unprecedented restitution/reconstruction.
nationwide_collapse
failed_R&D_scaleup
international_conflict
Personnel
1800 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 1000 | [#8] Approx. 1,000 guards/convoy/security personnel to provide 24/7 coverage; cost basis reflected in staff_wages. |
| Field Retrieval & Hazard Teams | 500 | [#7] Rapid-response technicians and retrieval operatives (estimate 300–800; 500 used in budgeting). |
| Covert Operations / Suppression Teams | 200 | [#9] High-skill clandestine operators (~200); costs budgeted under covert_operations. |
| Research Scientist / Specialized Research Staff | 100 | [#17] Chronologists, physicists, memeticists and clinicians (50–200; 100 used for budgeting). |
Confidence Notes
Estimates are low-confidence due to the anomalous and uncertain nature of SCP-8021, wide cost ranges in analyst notes, event-driven spikes (cleanup/evacuations), and unknowns around whether technical remediation is possible.