SCP-8030
Physical
~
medium confidence
SCP-8030
Expected annual
$2.0M
One-time setup
$3.5M
Annual recurring
$2.0M
Personnel
27
One-time setup is approximately $3,485,000 driven primarily by vault construction, contingency reserve and specialized steam-handling equipment; annual recurring operations are about $1,984,500/year driven by staff wages, insurance, legal/cover operations and ongoing monitoring/maintenance.
One-Time Capital Costs
Total: $3.5M
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Normal uneventful year with routine operations, monitoring and scheduled maintenance only.
no incidents
routine maintenance
scheduled experiments
🚨
Minor Incident
$2.3M/yr
Localized steam overpressure or equipment failure causing limited facility damage, medical treatment for personnel and small public exposure requiring response.
steam pulse overpressure
localized equipment failure
short public exposure / small evacuation
🚨
Major Breach
$4.5M/yr
Major containment breach or sudden large steam/pressure event causing extensive facility damage, prolonged public infrastructure impact, litigation and potential decommissioning action.
catastrophic steam release
structural failure
large public impact / prolonged remediation
Personnel
27 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Senior) | 1 | [#9] Senior anomalous researcher (oversight and protocol lead). |
| Research Scientist (Mid-level) | 2 | [#9] Mid-level researchers for experiments and monitoring. |
| Technician | 2 | [#9] Lab/maintenance technicians supporting experiments and equipment. |
| Security Officer / MTF Agent | 15 | [#10] Rotating guard staff to provide 24/7 vault perimeter and access control. |
| Site Director / Executive Staff | 1 | [#9] Site leadership and executive oversight included in staffing budget. |
| Engineer / Maintenance | 2 | [#6, #19] Engineers/maintenance staff responsible for power, HVAC, steam systems and spare-parts upkeep. |
| IT Specialist | 1 | [#18] IT/security specialist for classified storage, encrypted logging and audits. |
| Conservator / Preservation Specialist | 1 | [#12] Artifact conservator handling wood/leather preservation and inspections. |
| Medical Officer / EMT | 1 | [#17] On-call medical staff / EMT for burn care and drills. |
| Administrative Staff | 1 | [#14] Administrative support for scheduling, cover operations and procurement. |
Confidence Notes
Containment hardware and staffing needs are well-scoped and many line items provide explicit ranges, but wide ranges and uncertainty about the object's steam-production profile, ritual/theological risk, and insurance availability reduce precision.