SCP-805
Euclid
~
medium confidence
SCP-805
Expected annual
$1.0M
One-time setup
$1.7M
Annual recurring
$974K
Personnel
4.5
Initial capital and reserves are the main up-front drivers (reinforced stable build-out, HVAC, generators, lab setup, and contingency reserves). Recurring annual costs are dominated by staff wages, an active research/medical surveillance program, and ongoing facilities and consumables, giving a mid-range baseline annual operating cost under $1M.
One-Time Capital Costs
Total: $1.7M
Annual Recurring Costs
Total: $974K/yr
Cost Scenarios
📊
Baseline
(baseline)
$974K/yr
Normal operational year with no major incidents; routine research, surveillance, and maintenance.
no containment incidents
routine sampling and maintenance
🚨
Minor Incident
$1.0M/yr
Limited exposure event(s) causing 1–2 transformations, medical treatment, additional pathology and disposal costs, and localized PR/legal response.
single staff exposure
small-scale containment breach
🚨
Major Breach
$2.5M/yr
Significant containment failure with multiple exposures, public exposure risk, mass response, litigation, and large emergency operations.
multi-person exposure
public/press involvement
large emergency disposal operations
🚨
Scale Up Buildout
$3.6M/yr
Deliberate decision-year to build out on-site BSL-3 capability and an on-site incinerator (capital expansion).
policy decision to internalize high-containment work
decision to build on-site incineration capability
Personnel
4.5 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 3 | Three Level-2 guards to provide 24/7 door coverage (shift coverage + relief). |
| Research Scientist (Xenobiologist / Toxicologist) | 1 | One full-time xenobiologist/toxicologist responsible for sample analysis and oversight. |
| Veterinary Specialist | 0.5 | Part-time equine/veterinary specialist (0.5 FTE) for handling, necropsy support, and behavior assessment. |
Confidence Notes
Analyst notes are detailed and supply reasonable mid-range estimates, but key uncertainties remain (frequency of incidents, decision to build BSL-3/incinerator, and per-incident costs). This yields a medium confidence level.