SCP-806
Safe
~
medium confidence
SCP-806
Expected annual
$1.4M
One-time setup
$1.8M
Annual recurring
$1.4M
Personnel
8
One-time capital/setup costs are dominated by containment locker buildout, lab/digitization hardware, and an allocated contingency reserve; recurring annual costs are dominated by staff wages (security + technicians + observers), long-term care/stipends, legal/cover budgets, and site overhead. Baseline annual operations are estimated at ~USD 1.42M with significant upward risk from incident response and legal/containment events.
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Routine year with no significant containment incidents; regular research, maintenance, long-term care, and overhead expenditures only.
normal_operations
scheduled_research
routine_maintenance
🚨
Minor Incident
$1.5M/yr
Small containment event or accidental partial formation requiring single MTF callout, extra autopsy/disposal, and limited legal/witness handling.
accidental_shutdown_or_partial_formation
localized_contamination
single_mtf_deployment
🚨
Major Breach
$1.9M/yr
Significant containment breach or public exposure requiring large-scale MTF operations, extended legal/cover response, and remediation.
runaway_instance_recovery
multi-agency_response
substantial_cover_operations
🚨
Catastrophic Breach
$3.4M/yr
Rare, large-scale failure resulting in major exposure, contamination, public liability, or forced relocation of containment.
widespread_exposure
multi-site_remediation
major_legal_and_relocation_costs
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Level-1 | 4 | [#8] Four Level-1 personnel to provide 24/7 supervision coverage (includes overlap and benefits as budgeted). |
| Technician | 1 | [#3] Skilled technician (1 FTE) for projector maintenance, calibration, and mechanical repairs. |
| Research Assistant / Observer | 2 | [#7] Viewing/observer staff (1.0–2.0 FTE approximated as 2 rostered personnel) to cover continuous-viewing requirements and experiments. |
| Administrative Staff | 1 | [#23] Admin/approval support for experiment paperwork, scheduling, and minor site admin duties. |
Confidence Notes
Analyst notes provide detailed line-item ranges for nearly all cost drivers, allowing mid-range estimates; however substantial ranges and discretionary budgets (contingency, legal, frequency of experiments) introduce material uncertainty, so confidence is medium.