SCP-8096
Euclid
~
medium confidence
SCP-8096
Expected annual
$1.9M
One-time setup
$2.0M
Annual recurring
$1.8M
Personnel
14
Initial capital expenses are moderate-to-high (~$1.96M) driven by specialized chamber construction, Faraday/signal controls, and a contingency reserve; recurring annual costs are substantial (~$1.83M/yr) dominated by 24/7 staffing and a yearly containment/leak reserve.
One-Time Capital Costs
Total: $2.0M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal operational year with no major incidents; routine containment, monitoring and staffing costs only.
no_incident
routine_operations
🚨
Minor Incident
$1.9M/yr
Small protocol breach or isolated unauthorized image capture that requires rapid legal/cleanup response and overtime.
unauthorized_image_capture
localized leak or staff protocol breach
🚨
Major Breach
$3.3M/yr
Widespread image leak or cult/media exposure requiring large-scale legal, PR, emergency transfer or reclassification actions.
widespread_image_leak
cult_network_exposure
political/media attention
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#7] 6 FTEs for 24/7 coverage (estimate from analyst notes: 2per shift × 3 shifts). Salary and benefits included in staff_wages. |
| Childcare / Containment Technician | 2 | [#8] 2 FTEs (vetted child-care technicians); budgeted accordingly in staff_wages. |
| Research Scientist | 3 | [#16] 3 researchers (anthropologist/forensic, memetics, analyst) included in research staffing budget. |
| Medical Officer / Nurse | 2 | [#9] 1–2 clinical staff plus physician consults (combined to 2 headcount equivalent covered by medical staffing budget). |
| Psychologist / Therapist | 1 | [#10] 1 psychologist / trauma counselor covered by psychological services budget. |
Confidence Notes
Notes provide many line-item estimates and operational detail reducing uncertainty, but multiple wide ranges (construction, contingency reserve, breach costs and staffing mixes) and memetic/unknown tail risks leave moderate uncertainty.