SCP-812
Euclid
~
medium confidence
SCP-812
Expected annual
$926K
One-time setup
$1.1M
Annual recurring
$920K
Personnel
7
One-time upfront costs are approximately $1.11M driven by containment construction, pumps/ROV and research setup; recurring annual costs are approximately $920.5k driven primarily by staff wages, research/monitoring, and logistics/disposal.
One-Time Capital Costs
Total: $1.1M
Annual Recurring Costs
Total: $920K/yr
Cost Scenarios
📊
Baseline
(baseline)
$920K/yr
Normal year with routine monitoring, maintenance, occasional small removals and no major incidents.
routine_monitoring
scheduled_drills
regular_tanker_removal
🚨
Minor Incident
$970K/yr
Small accidental double-door opening or rapid inflow event requiring emergency pumps, vacuum-truck rental for a few days, and minor repairs.
accidental_opening
short-duration_flood
localized_cleanup
🚨
Major Breach
$1.4M/yr
Sustained uncontrolled discharge (both doors opened or major structural failure) causing large-volume flooding, extended cleanup, and container refurbishment.
both_doors_open_simultaneously
structural_failure
extended_pumping_and_repairs
🚨
Environmental Contamination
$1.9M/yr
Contamination or remediation event requiring large-scale soil/groundwater remediation, regulatory fines, and long-term monitoring.
groundwater_contamination
regulatory_remediation
major_environmental_response
Personnel
7 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 3 | Three FTEs to provide 24/7 coverage (3-shift rotation); costed at ~$60k/yr each. [#6] |
| Research Scientist | 1 | Lead scientist for sampling and expedition planning; salary included in staff_wages. [#13, #14] |
| Research Technician | 1 | Technician to support sampling, ROV ops and instrument maintenance. [#13, #14] |
| Engineer / Maintenance | 1 | Facilities/engineer for pumps, generator, containment maintenance. [#9, #10] |
| Administrative Staff | 1 | Permits, recordkeeping, scheduling and liaison for legal/PR. [#18, #19] |
Confidence Notes
Analyst notes provide detailed line-item ranges allowing reasonable mid-range estimates, but uncertainty remains due to site-specific permitting, frequency of moves, and low-probability high-cost remediation events.