SCP-8124
Unknown
~
medium confidence
SCP-8124
Expected annual
$2.1M
One-time setup
$2.3M
Annual recurring
$2.0M
Personnel
14
Initial one-time setup and contingency funding are large (≈ $2.27M) driven by containment chamber, R&D, lab setup and strategic reserves; annual operations run ≈ $2.00M/yr dominated by 24/7 security, research staff, emergency response readiness and ongoing R&D/legal costs.
One-Time Capital Costs
Total: $2.3M
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Normal year with no major incidents; steady-state operations and routine testing cadence (~20 tests/yr).
routine_testing
no_breach
regular_maintenance
🚨
Minor Incident
$2.1M/yr
Isolated containment/test incident requiring local recovery, additional medical follow-up, short PR/legal work and replacement of consumed supplies.
failed_test_activation
localized_medical_response
short_term_PR_response
🚨
Major Breach
$3.5M/yr
Unauthorized activation, loss of control or exposure event requiring large-scale recovery, international/legal action and heavy use of contingency funds.
unauthorized_access
public_exposure
multi-site_recovery_operations
🚨
Strategic Exploitation
$5.0M/yr
Decision/year in which SCP-8124 is treated as a strategic asset, triggering rapid scale-up: facility expansion, classified operational units and major R&D scale.
policy_decision_scale_up
classified_operational_investment
major_R&D_scale
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#3] Full-time watch staff estimated at ~8 guards to cover continuous shifts (estimate used in wage total). |
| Security Sergeant / Supervisor | 1 | [#3] Shift supervisor/sergeant to manage 24/7 watch rotations. |
| Research Scientist | 1 | [#14] Principal Investigator leading experiments and analysis. |
| Research Technician | 3 | [#14] Technicians supporting testing, instrumentation and chain-of-custody. |
| Administrative Staff | 1 | [#4] Site security/admin overhead: access logging, clearance checks and scheduling. |
Confidence Notes
Line-item estimates are explicit in analyst notes for most categories (security, R&D, per-test costs), so totals are reasonably constrained; uncertainty remains around test cadence, frequency of adverse events, and high-variance contingency/strategic scenarios which reduces confidence from 'high' to 'medium'.