SCP-8132
Unknown
~
medium confidence
SCP-8132
Expected annual
$797K
One-time setup
$1.2M
Annual recurring
$774K
Personnel
5
Estimated upfront capital and equipment costs are approximately $1.22M driven by contingency seed, research imaging/robotic hardware, and nested containment fabrication; ongoing annual costs are approximately $774k/year driven by specialist staff wages, R&D/monitoring, lease costs, and contingency top-ups.
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $774K/yr
Cost Scenarios
📊
Baseline
(baseline)
$774K/yr
Normal year with scheduled relocations twice per year, routine scans, maintenance, training, and no containment incidents.
scheduled relocations
routine monitoring
regular training/maintenance
🚨
Minor Incident
$924K/yr
Limited unauthorized access or tampering, or small-scale infoallergenic exposure requiring targeted response and additional amnestic treatments.
container tampering detected
localized exposure to one or a few personnel
small-scale forensic/amnestic response
🚨
Major Breach
$2.0M/yr
Significant breach or information release requiring large-scale amnestic deployment, public cover-up operations, quarantine, and potential long-term containment escalation.
widespread infoallergenic exposure
loss of location secrecy / public exposure
container destruction or mass unauthorized dissemination
Personnel
5 total
| Role | Count | Notes |
|---|---|---|
| MAUDE Officer / Program Manager | 1 | [#6] Senior MAUDE officer responsible for location assignments, approvals, and oversight. |
| Memetics / Infohazard Specialist | 1 | [#7] Specialist for memetic assessment, handling protocols, and ongoing oversight (0.5–1.0 FTE equivalent). |
| Imaging / Scan Operator | 1 | [#8] Technician/operator for non-invasive scans, imaging runs, and contracted scan coordination. |
| Engineer / Robotic Maintenance | 1 | [#9] Technician for robotic/remote handling suite maintenance and systems operations. |
| Administrative Staff | 1 | [#6, #16] Fractional administrative support for record management, lease coordination, and relocation paperwork (0.1–0.5 FTE equivalent represented as one staff member). |
Confidence Notes
Estimates derived from analyst ranges; many line items have wide ranges (notably contingency/reserve and specialist staffing). Uncertainty in frequency of incidents and required R&D increases variance, so confidence is medium.