SCP-8180
Euclid
~
medium confidence
SCP-8180
Expected annual
$80.9M
One-time setup
$1.8M
Annual recurring
$80.3M
Personnel
34
Estimated one-time startup costs are modest (~$1.78M) while annual recurring costs are substantial (~$80.3M/yr), driven primarily by per-case monitoring personnel and heavy case-management, plus actor-related ongoing obligations and contingency/legal reserves.
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $80.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$80.3M/yr
Normal operational year with routine monitoring, periodic takedowns, and no major incidents.
no major incidents
routine monitoring and replacements
normal legal activity
🚨
Minor Incident
$82.3M/yr
Limited public exposure or small litigation events requiring extra takedowns, legal work, and a modest increase in replacements.
localized public exposure
small-scale litigation or settlement
temporary increase in replacements
🚨
Major Breach
$105.3M/yr
Widespread viral leak or platform non-cooperation demanding large-scale intervention, mass replacements, and major legal response.
widespread viral content
coordinated leak
platform refuses routine cooperation
🚨
Catastrophic Exposure
$230.3M/yr
Mass public disclosure, intense media scrutiny, major court actions and emergency mass-intervention/relocation.
nationwide media scrutiny
major litigation/judgments
mass interventions or evacuations
Personnel
34 total
| Role | Count | Notes |
|---|---|---|
| Engineer / SRE | 3 | [#4] Data engineering & ops personnel (2–4 FTEs; midpoint 3). |
| Research Scientist | 6 | [#11] Project research team (psychologists, behavioral scientists, data scientists; 4–8 FTEs; midpoint 6). |
| Research / Human Review Analyst | 15 | [#5] Human review/content moderation team (10–20 analysts; midpoint 15). |
| Replacement Actor / Performer | 10 | [#14] Replacement-actor program (assumed small pool of 10 actors for baseline salary calculations). |
Confidence Notes
Analyst notes give explicit ranges and drivers, allowing mid-range point estimates, but many items scale with uncertain affected-population size and policy choices (actor pool size, monitoring thresholds, frequency of replacements). This yields moderate confidence.