SCP-8185
Euclid
~
medium confidence
SCP-8185
Expected annual
$443K
One-time setup
$253K
Annual recurring
$437K
Personnel
3.5
One-time startup costs largely driven by containment retrofit, HVAC/kitchen integration, and a contingency reserve (~$253k). Annual costs are dominated by staff wages (handler, researcher, security) and recurring consumables/legal/oversight (~$437k/yr).
One-Time Capital Costs
Total: $253K
Annual Recurring Costs
Total: $437K/yr
Cost Scenarios
📊
Baseline
(baseline)
$437K/yr
Normal year with standard operations, no major incidents or upgrades.
routine operations
scheduled training and maintenance
🚨
Minor Incident
$452K/yr
Localized incident such as an injury, small escape attempt, or emergency veterinary procedure requiring limited extra spending.
emergency veterinary procedure
limited appliance/fixture damage
🚨
Major Breach
$557K/yr
Containment failure or significant unauthorized access leading to public exposure, legal costs, and higher security/PR spending.
escape or public exposure
legal action / intense media scrutiny
🚨
Containment Upgrade
$587K/yr
Discovery of manipulation or escalation in SCP behavior necessitates urgent facility upgrades and staffing increases.
evidence of containment manipulation
behavioral escalation
Personnel
3.5 total
| Role | Count | Notes |
|---|---|---|
| Animal Handler / Caretaker | 1 | Dedicated full-time handler for daily care and feeding. Salary included in staff_wages. |
| Research Scientist | 1 | Ethologist/behavioral researcher (FTE) to run studies and monitor cognition; salary included in staff_wages. |
| Security Officer / MTF Agent | 1 | On-site security presence (single guard assumed) to prevent unauthorized access; salary included in staff_wages. |
| Culinary Consultant (part-time contractor) | 0.25 | Part-time contractor/advisor for diet and cooking coordination; contractor fees included in staff_wages. |
| Psychologist / Negotiator (part-time) | 0.25 | Part-time specialist for sessions with the sapient subject and staff support; fees included in staff_wages. |
Confidence Notes
Analyst notes provide detailed line-item ranges for most costs making mid-range estimates feasible, but several items (contingency upgrades, frequency of major incidents, staff FTE mixes) remain uncertain; hence medium confidence.