SCP-8186 Unknown ? low confidence
SCP-8186
Expected annual
$7.0M
One-time setup
$47.6M
Annual recurring
$6.2M
Personnel
18
Estimated initial capital of approximately $47.6M driven primarily by facility buildouts (including an emergency containment build) and research instrumentation; ongoing annual operating costs are ~ $6.2M/yr driven by core research staff, data/compute, neuroimaging maintenance, memetic safety, and contingency funding.
🏗️ One-Time Capital Costs Total: $47.6M
Facilities $26.1M
[#3, #10, #25] Lab/office retrofit ($1.0M typical), climate-controlled sample vault buildout ($100k), and emergency containment site buildout (~$25M mid-range).
Contingency Reserve $8.8M
[#28] Contingency reserve sized as ~20% of one-time capital + 20% of first-year operating (calculated from other line items).
Initial Research And Lab Setup $8.0M
[#4, #5, #6, #7, #8, #9, #12, #15] Research lab & instrument purchases and protocol setup: fMRI (~$2.0M), EEG rigs (~$100k), optional MEG (~$4.0M if pursued), mineral analysis suite (~$1.4M), software development (~$300k), initial seed collection (~$100k), human-subject protocol setup (~$20k), memetic testing environment setup (~$100k).
Decommissioning And Mothballing $3.0M
[#29] Decommissioning / safe shutdown costs (planning mid-range ~$3M).
Anti Memetic R And D $1.0M
[#16] One-time R&D setup for anti-memetic/containment tech (planning figure ~$1.0M).
Equipment $575K
[#11, #17] Initial on-prem server/backup hardware (~$300k) and physical security upgrades (access control/CCTV/badge systems one-time portion, ~$275k).
Legal Retainer $50K
[#19] One-time legal/setup retainer for permits, MOUs, export/compliance setup (~$50k).
Public Relations Assets $50K
[#20] One-time PR/cover-story initial assets (~$50k).
🔄 Annual Recurring Costs Total: $6.2M/yr
Staff Wages $2.3M/yr
[#1, #2, #15, #17, #30] Core research team salaries (PI, senior researchers, postdocs, technicians) and administrative/IT payroll, memetic safety staff, security guard payroll (~4 guards), and program/project management (~$2.34M total including benefits).
Research And Monitoring $1.2M/yr
[#4, #5, #8, #11, #12, #13, #14] Ongoing research operational costs: fMRI servicing (~$150k), mineral instrument service (~$100k), data infrastructure cloud/compute/upkeep (~$200k), software maintenance (~$200k), large-scale social/cultural data licences (~$300k), participant compensation (~$225k), and IRB/ethics maintenance (~$50k).
Contingency Top Up $1.0M/yr
[#28] Recurring contingency/top-up (~20% of first-year operating) to replenish reserve and handle escalations (~$1.033M/yr).
Logistics And Transport $375K/yr
[#9, #21] Sample acquisition, fieldwork logistics, shipping, insurance and travel/collaboration costs (~$200k and ~$175k respectively).
Cover Story And Legal $325K/yr
[#19, #20] Ongoing legal/compliance and PR/cover operations (~$100k legal + ~$225k PR/messaging).
Facilities Maintenance $260K/yr
[#10, #23] Vault utilities/maintenance and general facilities utilities / HVAC / fMRI cryogen power (~$260k/yr combined).
Anti Memetic R And D $250K/yr
[#16] Ongoing R&D follow-up for anti-memetic/containment tech (~$250k/yr).
Insurance And Liability $100K/yr
[#24] Insurance for staff, specimens in transit, and liability from human-subject research (~$100k/yr).
Background Checks And Clearances $100K/yr
[#18] Security vetting and clearance costs for personnel (~$100k/yr).
Staff Wellbeing $100K/yr
[#27] Staff mental-health, rotation, and counseling program (~$100k/yr).
Supplies And Consumables $90K/yr
[#6, #22] EEG consumables and routine lab supplies (glassware, PPE, electrodes, shipping consumables) (~$90k/yr).
Emergency Site Operation $0/yr
[#26] Long-term site operation costs if an emergency containment site is activated ($400k–$1M/yr). Set to $0 in baseline (inactive) but modeled in incident scenarios.
Cost Scenarios
📊 Baseline (baseline) $6.2M/yr
85.0% probability / year
Normal research year with no major incidents; standard operations and planned maintenance only.
routine_research scheduled_maintenance normal_staff_turnover
🚨 Minor Incident $6.7M/yr
12.0% probability / year +$500K vs baseline
Localized memetic leak, minor subject harm, or security/data incident requiring emergency response, additional legal/PR, and short-term remediation.
localized_memetic_leak unexpected_subject_harm minor_data_breach
🚨 Major Breach $32.4M/yr
3.0% probability / year +$26.2M vs baseline
Active, contagious noöspheric signal or other severe event necessitating activation/buildout of hardened emergency containment and sustained site operation.
major_breach active_contagious_noöspheric_signal containment_activation
👥 Personnel 18 total
Role Count Notes
Research Scientist / PI 1 [#1] Principal investigator (senior salary included in staff_wages).
Senior Researcher 2 [#1] Senior-domain researchers for experiments and analysis.
Postdoctoral Researcher 3 [#1] Postdocs supporting experiments and data analysis.
Laboratory Technician 2 [#1] Technical support for instruments, sample prep, and experiments.
Memetic Safety Specialist 2 [#15] Specialists for memetic/red-team assessments and safeguards (staffing portion of memetic program).
Security Officer / MTF Agent 4 [#17] On-site guards and security personnel for lab and vault protection.
Administrative Staff 3 [#2] Lab manager, sysadmin, grant/finance manager (administrative & IT staffing).
Project Manager / Program Officer 1 [#30] Central program management and oversight.
📋 Confidence Notes
SCP-8186 is theoretical/noöspheric and many cost drivers (anti-memetic R&D, emergency containment need, optional instrumentation) are highly uncertain; estimates combine mid-range assumptions and provided ranges but have substantial tail risk and scalability uncertainty.
← SCP-8185 ↑ All SCPs SCP-8187 →