SCP-8201
Keter
?
low confidence
SCP-8201
Expected annual
$68.5M
One-time setup
$166.3M
Annual recurring
$65.4M
Personnel
97
First-year capital outlay is dominated by field hardware, facility construction, and a contingency large-scale interdiction plan (~$166M one-time). Main recurring drivers are detainee housing/care, personnel, and contingency reserve allocations (~$65.4M/yr).
One-Time Capital Costs
Total: $166.3M
Annual Recurring Costs
Total: $65.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$65.4M/yr
Normal operational year with expected boarding events handled within routine capacity and no major incidents.
routine_boarding_events
normal_detention_intake
no_major_public_exposure
🚨
Minor Incident
$71.7M/yr
Surge year with several simultaneous Boarding Events causing additional detentions, overtime, and emergency consumable use.
simultaneous_boarding_events
mass_exposure_surge
surge_detentions
🚨
Major Breach
$190.4M/yr
Activation of large-scale interdiction / capture operation and major public-visibility incident requiring emergency expenditures and large one-time operation costs.
attempted_physical_capture
widespread_public_exposure
multi-jurisdictional_emergency
Personnel
97 total
| Role | Count | Notes |
|---|---|---|
| Intelligence Analyst / Ops Staff | 9 | [#9] 24/7 monitoring analysts, data scientists and watch officers; 6–12 FTEs recommended (mid used here). |
| Research Scientist / Memetics Specialist | 8 | [#17] Memetics research specialists (6–10 staff); personnel cost included in staff_wages. |
| Security Officer / MTF Agent | 80 | [#11] Regional rapid-response task forces: ~10 teams with multi-person tactical staffing (aggregate ~80 personnel); costs included in staff_wages. |
Confidence Notes
Large uncertainties in two primary drivers: boarding-event frequency and detainee intake per event; many line items are ranges and memetic hazards add operational unpredictability. Estimates use mid-range assumptions and a notional detainee baseline (150/yr).