SCP-823
Euclid
~
medium confidence
SCP-823
Expected annual
$6.6M
One-time setup
$18.9M
Annual recurring
$6.2M
Personnel
53
First-year one-time setup and remediation costs are large (≈$18.9M) driven by hardened containment, demolition/structural work, a containment vault, and specialized lab/memetic infrastructure; steady-state annual operations are estimated at ≈$6.19M/yr, driven by security staffing, research staff, and ongoing contingency/reserve allocations.
One-Time Capital Costs
Total: $18.9M
Annual Recurring Costs
Total: $6.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.2M/yr
Normal year with active on-site containment, routine maintenance, training, and reserved contingency allocations.
no realignment events
routine operations only
🚨
Minor Incident
$6.4M/yr
Single localized realignment or small breach requiring MTF insertion, short evacuation, limited equipment replacement and medical response.
small realignment
single MTF deployment
minor equipment losses
🚨
Major Breach
$9.2M/yr
Multi-unit realignment/large breach with mass-casualty handling, extended MTF operations, demolition/stabilization and heavier remediation/cover costs.
widespread realignment
multiple casualties
major equipment destruction
🚨
Catastrophic Breach
$26.2M/yr
Worst-case event on the scale of 'Bloody Sunday' with hundreds of casualties, large-area realignment, site-wide demolition or neutralization, and major public-exposure response.
site-wide realignment
mass civilian casualties
major media exposure
Personnel
53 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 27 | [#1] 27 full-time on-site patrol/guard positions (includes sniper-qualified operators and shift coverage). |
| Mobile Task Force Detachment (on-call) | 6 | [#2] Dedicated MTF rotation on-call (not all on-site at once). |
| Research Scientist / Lab Technician | 8 | [#14] On-site research team for memetic/material analysis and containment science. |
| Medical Officer / Medic | 2 | [#10] On-site medic coverage and trauma care. |
| Engineer / Maintenance | 3 | [#3, #8, #12] Facilities, vehicle and generator maintenance and demolition oversight. |
| Administrative Staff / Program Management | 6 | [#33] Program managers, auditors, logistics and administrative support (includes cover-record maintenance responsibilities). |
| Site Director / Executive Staff | 1 | [#33] Senior on-site oversight and liaison to higher Foundation command. |
Confidence Notes
Analyst notes provide ranges and many contingent/one-off items; core recurring and staffing figures are well-specified, but one-time capital and contingency sizing (vault, demolition, memetic infra) are uncertain — hence medium confidence.