SCP-8231
Anomalous
~
medium confidence
SCP-8231
Expected annual
$1.1M
One-time setup
$6.1M
Annual recurring
$1.1M
Personnel
7
One-time setup and contingency (including optional restoration program) total approximately $6.08M, driven primarily by a potential long-term restoration program; recurring annual costs are about $1.05M, driven by staff wages, legal/cover costs, and site overhead.
One-Time Capital Costs
Total: $6.1M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal, uneventful operational year with routine research, maintenance, and staffing costs.
normal_operations
routine_research
scheduled_maintenance
🚨
Minor Incident
$1.2M/yr
Localized failure (e.g., HVAC or lighting failure, short generator downtime) requiring emergency response, repairs and overtime.
power_outage
HVAC_failure
sensor_or_controller_fault
🚨
Major Breach
$3.6M/yr
Containment breach or serious unauthorized access resulting in major response, reconstruction, legal action and potential loss mitigation.
unauthorized_access
security_system_compromise
anomalous_agent_activity
🚨
Restoration Program Initiated
$6.1M/yr
Decision is made to initiate large-scale long-term preservation/planetary restoration program; major multi-year capital expenditure occurs.
decision_to_scale
strategic_restoration_program
international_collaboration
Personnel
7 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#6] Escort and armed detail for daily interactions; staffing reflects on-call/escort team strength. |
| Research Scientist (Lead Botanist) | 1 | [#8] Senior botanist/plant physiologist responsible for experimental design and oversight. |
| Laboratory / Grounds Technician | 1 | [#8] Technician to manage care, sampling, and lab tasks. |
| Rotating Operational Personnel (watering/handling pool) | 3 | [#9] Pool of rotating staff who perform daily watering under escort; counted as on-call/available operational personnel. |
Confidence Notes
Estimates use midpoints of wide ranges provided in analyst notes; key uncertainties include specification level for containment, whether the optional restoration program is initiated, and variability in legal/PR exposure costs.