SCP-8321
Euclid
~
medium confidence
SCP-8321
Expected annual
$9.0M
One-time setup
$9.7M
Annual recurring
$3.8M
Personnel
20
One-time capital and structural upgrades (blast-rated cell, HVAC, power, robotics) dominate initial costs (~$9.68M in this estimate); recurring staffing (handlers, security, research) and reserves/insurance are the main annual costs (~$3.795M/yr), with low-probability catastrophic event risk that could raise expected annual cost to roughly $9.045M when probabilistically weighted.
One-Time Capital Costs
Total: $9.7M
Annual Recurring Costs
Total: $3.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.8M/yr
Normal operational year with no major incidents; containment and research proceed as planned.
routine operations
no detonation or major breach
🚨
Minor Incident
$8.8M/yr
Localized incident or small detonation/damage limited to containment cell and nearby infrastructure; injuries and legal/cleanup costs limited but material.
localized detonation
partial structural damage
medical and remediation costs
🚨
Major Detonation
$1.0B/yr
Catastrophic self-detonation or high-yield detonation causing large-scale destruction, mass casualties, site loss, major reconstruction and extensive cover-up/liaison operations.
high-yield detonation
site annihilation
mass casualty response and national-level cover-up
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Handler | 4 | [#3] 24/7 direct-communication handlers (rotating shifts, backups). |
| Security Officer / MTF Agent | 9 | [#4] Armed guards and perimeter security (8–10 guards to cover shifts). |
| EOD Specialist (contractor/retainer) | 1 | [#5] On-call explosives ordnance disposal specialist(s) on retainer/contract. |
| Research Scientist | 3 | [#6] Biomechatronics/materials/psych/AI researchers (part of research team FTEs). |
| Engineer / Lab Technician | 3 | [#6] Lab technicians, imaging/robotics engineers and support staff for experiments and maintenance. |
Confidence Notes
Estimates are based on wide ranges provided in analyst notes; many line items (explosive yield, optional buried vault, insurance/reserve sizing) have high variance and catastrophic-tail risk, which reduces precision but the listed recurring and capital categories are well identified.