SCP-8342
Keter
~
medium confidence
SCP-8342
Expected annual
$14.5M
One-time setup
$72.7M
Annual recurring
$13.2M
Personnel
59
Initial capital construction and site acquisition dominate one-time costs (~$73M), driven by subterranean reinforced rings, transport upgrades, and specialized hardware. Annual operating costs (~$13.15M/yr) are driven by on-site staff (security + research), insurance/legal/cover-story, and recurring logistics/maintenance.
One-Time Capital Costs
Total: $72.7M
Annual Recurring Costs
Total: $13.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$13.2M/yr
Normal operational year with scheduled monitoring, maintenance, and no major anomalous incidents.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$15.2M/yr
Localized anomalous activation causing limited structural damage, medical casualties, and extra repairs/compensation.
localized_magnetic_event
short_spatio-temporal_disruption
🚨
Major Breach
$23.1M/yr
Significant containment breach or prolonged anomalous activity requiring extended repairs, large-scale evacuations and indemnities.
prolonged_astronomical_event
partial_concentric_ring_failure
🚨
Catastrophic Breach
$213.2M/yr
Large-scale disclosure or catastrophic spatial event affecting island and surrounding communities; federal-level response and relocation required.
total_spatial_tear
widespread_disclosure
Personnel
59 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 30 | [#8] Armed guards and perimeter/entry teams for 24/7 coverage and rotations. |
| Research Scientist | 10 | [#10, #29] Archaeologists, geologists, physicists, thaumaturgy researchers and astronomers for continuous monitoring and modelling. |
| Medical Officer | 4 | [#11] On-site medics and trauma support to handle casualties and quarantine. |
| Engineer / Maintenance | 6 | [#2, #6, #12] Facility engineers, power/microgrid technicians, and sensor/robotics maintenance staff. |
| Administrative Staff | 6 | [#25, #17] Administrative, logistics coordinators, and cover-story/PR liaisons. |
| Conservator / Archaeologist | 2 | [#16, #30] Artifact conservation, cataloguing, and cultural liaison specialists. |
| Site Director / Executive Staff | 1 | [#2] Senior management / site director responsible for operations and government coordination. |
Confidence Notes
Estimates are built from analyst ranges and mid-point assumptions; many anomalous costs are highly non-linear and scenario-dependent (not fully quantifiable). Legal, cultural and contingency expenses introduce additional uncertainty.