SCP-8396 Maybe ? low confidence
SCP-8396
Expected annual
$29.7M
One-time setup
$347.9M
Annual recurring
$28.2M
Personnel
55
Baseline containment requires a large up-front investment (~$348M) driven by vehicle procurement, vessels, lab/vault buildout, and large contingency reserves; ongoing operations run roughly $28.2M/year, dominated by mission logistics, staffing, memetic monitoring, and legal/cover operations.
🏗️ One-Time Capital Costs Total: $347.9M
Emergency Reserve $100.0M
[#14] Contingency reserve for disaster mitigation / compensation in the event of geological/tsunamigenic incidents.
Insurance Reserve $100.0M
[#15] Internal indemnity and legal defense reserve in lieu of traditional insurance for catastrophic/existential risks.
Deepsub $50.0M
[#1] Purchase of a full-ocean-depth-rated manned submersible (DSV) for direct interventions and recoveries; purchase chosen over charter in baseline.
Support Vessel $40.0M
[#3] Purchase of a dedicated DP-capable support vessel with helipad and mission labs (baseline buys vessel rather than chronic chartering).
Initial Research And Lab Setup $20.0M
[#7] Secure materials analysis and reality-research-capable lab build-out and specialized instrumentation.
Rovs Auvs $19.0M
[#2] Deep-rated work-class ROVs/AUVs (2–3 units) + spare parts for mapping, sampling, and interventions.
Facilities $5.0M
[#8] Hardened vault/build-out for recovered material (environmental, EM, memetic isolation).
Satellite Constellation $5.0M
[#17] One-time cost toward dedicated smallsat constellation or initial investment in persistent tasked assets.
Legal Diplomatic Setup $3.0M
[#13] One-time legal/diplomatic/liaison establishment costs (agreements, retainers, initial payoffs).
Memetic Platform $2.0M
[#11] Platform build & tooling for memetic containment, monitoring, and takedown operations.
Communications Infra $2.0M
[#18] Secure high-bandwidth comms infrastructure, isolated data storage, and redundancy build-out.
Obs Deployment $800K
[#5] Purchase/deployment costs for an ocean-bottom seismometer array (units + deployment).
Mapping Campaign $500K
[#4] Initial high-resolution bathymetric/sonar mapping campaign to survey and model the site.
Decontamination Setup $500K
[#22] Waste processing / decontamination facility and initial equipment procurement.
Security Recruitment Training $150K
[#10] Initial recruitment and training costs for armed security and response teams.
Equipment $0
[]
Large Engineering $0
[#16] Not pursued in baseline due to extreme technical/geological risk; theoretical containment/neutralization costs estimated at $500M–$severalB if attempted.
Scenario Summary $0
[#25] Interpretive scenario ranges (minimal monitoring vs full containment) summarized in analysis; not an additive one-time line item.
🔄 Annual Recurring Costs Total: $28.2M/yr
Logistics And Transport $7.3M/yr
[#2,#3,#21] Vessel operational costs, ROV/DSV mission ops, and secure sample transport (annualized mission logistics).
Staff Wages $5.0M/yr
[#9] Salaries for core scientific staff, lab personnel, and baseline technical staff (does not include security or memetics teams which are itemized separately).
Cover Story And Legal $3.5M/yr
[#12,#13,#23,#24] Public relations/cover operations, recurring legal and diplomatic liaison, public suppression actions and regional retainers/bribes.
Research And Monitoring $3.5M/yr
[#4,#5,#7,#17] Ongoing mapping re-surveys, OBS data ops, lab operational costs, and satellite tasking/data subscriptions.
Memetics Monitoring $3.0M/yr
[#11] Ongoing memetic containment staffing, 24/7 monitoring, legal takedowns, psyops, and platform operations.
Supplies And Consumables $2.0M/yr
[#6,#7] Mission-day consumables, ship fuel, lab consumables and expendables.
Security Personnel $1.2M/yr
[#10] On-site and at-sea armed security staffing, rotations, and travel.
Communications Ops $1.0M/yr
[#18] Secure data center operations, cybersecurity, and comms redundancy upkeep.
Facilities Maintenance $700K/yr
[#8] Maintenance, environmental controls, and utilities for vaults and physical infrastructure.
Medical And Rotation $500K/yr
[#20] Medical screening, psychiatric care, decompression support, and personnel rotations.
Training Drills $300K/yr
[#19] Regular deep-sea operations, non-disclosure, and memetic-handling training and drills.
Decontamination Ops $200K/yr
[#22] Annual operations for decontamination and hazardous materials processing.
Cost Scenarios
📊 Baseline (baseline) $28.2M/yr
94.4% probability / year
Routine monitoring, occasional missions, and normal operations with no major incidents.
scheduled_surveys regular_maintenance no_uncontrolled_exposure
🚨 Minor Incident $33.2M/yr
5.0% probability / year +$5.0M vs baseline
Localized operational incident (equipment loss, contained exposure, limited leak) requiring emergency missions, legal/PR response, and extra monitoring.
equipment_failure limited_memetic_leak unauthorized_media_disclosure
🚨 Major Breach $78.2M/yr
0.5% probability / year +$50.0M vs baseline
Significant containment failure or public certainty leak causing large-scale mitigation, compensation, and extended operations.
widespread_public_exposure geological_event_triggered_by_intervention
🚨 Attempted Engineering $1.0B/yr
0.1% probability / year +$1.0B vs baseline
An aggressive, large-scale seabed engineering/neutralization attempt is carried out, incurring massive one-time costs and high geological risk.
decision_to_physically_contain large_scale_construction
👥 Personnel 55 total
Role Count Notes
Research Scientist 10 Permanent oceanographers, marine geologists, materials scientists mapped to staff_wages.
ROV/DSV Pilot & Maritime Crew 20 Pilots, ship crew, and deck/hydraulic staff included in logistics and staff budgets.
Technician (electronics/lab) 10 ROV/DSV technicians, lab techs, and instrument specialists included in staff_wages.
Security Officer / MTF Agent 8 Armed maritime and facility security personnel covered by security_personnel line item.
Memetics / COG specialists 5 Memetic containment, monitoring, and takedown specialists covered by memetics_monitoring.
Administrative Staff 2 Logistics, scheduling, and administrative support included within staff_wages.
📋 Confidence Notes
Estimates are order-of-magnitude with wide ranges and large uncertainties due to the SCP's anomalous/memetic nature, unknown mission tempo, buy vs charter choices, and political/legal variables.
← SCP-8395 ↑ All SCPs SCP-8397 →