SCP-8412
Unknown
~
medium confidence
SCP-8412
Expected annual
$12.1M
One-time setup
$25.9M
Annual recurring
$11.3M
Personnel
38
One-time capital and contingency funds total approximately $24.995M, with baseline annual operations of about $11.278M; largest recurring drivers are personnel (rapid-response teams and research), embedded assets, and legal/cover operations, while major one-time drivers are contingency reserves and potential high-end physics work.
One-Time Capital Costs
Total: $25.9M
Annual Recurring Costs
Total: $11.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$11.3M/yr
Normal year with no major incidents or escalations; routine operations, investigations, coverups, and research continue.
routine_occurrences (12–16/yr)
no public exposure
no major surge in frequency
🚨
Minor Incident
$12.3M/yr
A year with one notable public incident requiring elevated legal settlements, PR campaigns, and supplemental hires/charters.
localized public leak
contentious family/legal dispute
one-off expensive charter or settlement
🚨
Major Breach
$21.3M/yr
Significant exposure or legal/operational failure requiring large settlements, extended legal defense, and major operational surge.
major media exposé or FOIA defeat
coordinated legal action
large-scale leak across jurisdictions
🚨
Research Breakthrough Requiring Scale Up
$61.3M/yr
Active attempt to physically access SCP-8412-1 requiring acquisition/rental of high-end physics apparatus or major bespoke construction.
decision to pursue physics-grade access
successful predictive lead requiring major experiment
activation of high-end contingency
Personnel
38 total
| Role | Count | Notes |
|---|---|---|
| Rapid-Response Team (Security Officer / MTF Agent) | 24 | [#1] Four regional teams × 6 personnel each; fully-burdened cost used in staff_wages. |
| Research Scientist | 10 | [#11] Core research staff working on selection method, prediction, and access attempts; included in staff_wages. |
| Lab / Technical Staff (Laboratory Technician) | 4 | [#11] Lab technicians supporting experiments and sample processing; included in staff_wages. |
Confidence Notes
Numerical estimates derive from analyst midlines and provided ranges; personnel and recurring operational costs are reasonably well-specified, but large contingencies (physics-grade access, scaling) and per-incident variability introduce substantial uncertainty.