SCP-8452
Safe
~
medium confidence
SCP-8452
Expected annual
$2.7M
One-time setup
$9.7M
Annual recurring
$2.6M
Personnel
11
Initial one-time capital for a bespoke high-bay containment cell and associated secure systems is roughly $9.7M, driven by construction, vaulting, remote manipulators and decommissioning reserves; annual operating costs are about $2.63M dominated by staff wages, legal/finance, utilities and research operations.
One-Time Capital Costs
Total: $9.7M
Annual Recurring Costs
Total: $2.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.6M/yr
Normal uneventful year with routine operations, maintenance and scheduled research activity only.
scheduled research
routine maintenance
no containment anomalies
🚨
Minor Incident
$2.8M/yr
Small anomalous event (localized silver eruption or limited dematerialization) causing minor structural/cleanup needs and short operational disruption.
small silver eruption
localized damage to containment finishings
sensor/robotic repairs
🚨
Major Breach
$4.1M/yr
Significant uncontrolled silver generation or structural failure causing major repairs, partial decommissioning, emergency response and higher legal/insurance costs.
large-volume silver eruption
structural damage to high-bay
emergency relocation/major repairs
🚨
Research Scale Up
$3.1M/yr
Accelerated research year requiring additional specialized instrumentation, contractor work and expanded containment precautions.
approved large-scale experiments
need for additional instrumentation
expanded testing protocols
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#9] Minimum dedicated security complement: 6guards for chamber (two per shift + overlap). |
| Research Scientist | 2 | [#10] Two Level-4 (senior) researchers required for test approvals and oversight. |
| Research Technician / Engineer | 3 | [#10] Supporting research technicians and one robotics engineer (aggregated to 3 FTEs). |
Confidence Notes
Analyst notes provide detailed line-item ranges enabling mid-point estimates, but the anomalous nature (telekinesis/dematerialization) and wide ranges for contingency/insurance/repairs introduce material uncertainty.