Expected annual
$12.2M
One-time setup
$16.9M
Annual recurring
$11.0M
Personnel
70
Initial capital investment is approximately $16.9M driven by facility retrofit, containment modules, mobile response assets, and initial R&D; recurring annual operations are about $11.0M driven by personnel, long-term R&D, and logistics/response costs.
🏗️ One-Time Capital Costs Total: $16.9M
Escalation Contingency Reserve $5.0M
[#28] Large one-time contingency reserve to begin scaling response capability if incidents escalate (reserve for rapid scale-up).
Containment Modules $2.0M
[#11] Modular containment boxes/traps sized for box-truck manifestations (telescoping shielding, cranes, hydraulic handling) for recommended 2–4 modules.
Long Term Rnd Initial $2.0M
[#24] Initial tranche for long-term containment R&D (field generators, dimensional dampeners) to seed multi-year experimental program.
Facilities $1.8M
[#1] Build-out of Site-64 lab annex: air-gapped lab annex, secure entry, controlled HVAC, negative-pressure rooms, shielding panels, secure comms, evidence storage, demolition and reinforced floors.
Mobile Response Units $1.6M
[#6] MTF-capable trailers/armored vans, containerized shielding, one contracted aircraft retainer and associated outfitting (2–4 mobile units + aircraft retainer).
Equipment $1.3M
[#2, #10] CYEIMD R&D & procurement (prototype + spares) and specialized handheld/bench detection instruments & bench rigs.
Insurance Reserve One Time $1.0M
[#20] Initial self-insurance / contingency reserve fund for property damage and liability (recommended seed reserve).
Detection Network Expansion $600K
[#8] Initial deployable/distributed field CYEIMD sensors (vehicle-mounted pods, roadside units) and comms provisioning.
Hvac Upgrades $300K
[#12] HVAC upgrades: HEPA, activated carbon, scrubbers, ionizing filtration and capability for negative pressure/isolation.
Sample Handling Storage $300K
[#15] Licensed radioactive/energetic sample storage, shielded casks, chain-of-custody systems and initial disposal contracts if contamination discovered.
Procurement Isuzu Vehicles $250K
[#18] Purchase of non-anomalous Isuzu Elf reference vehicles (recommended 4–10 vehicles; capital purchase).
Initial Research And Lab Setup $200K
[#9] Data storage, archival hardware, HPC and on-site secure backup setup for high-resolution telemetry and analysis.
Power Infrastructure $200K
[#3] Generators/UPS, automatic transfer switches, fuel storage and initial installation for 24/7 redundant power.
Communications Security One Time $180K
[#22] TEMPEST/Faraday enclosures, hardened encrypted comms hardware and air-gapped secure systems setup.
Archive Setup $125K
[#27] Secure long-term archival setup, off-site vaulting for manifests and chain-of-custody initial implementation.
Ppe Decon Suites $110K
[#13] Radiation suits, decontamination wash bays, portable shower kits, biohazard disposal setup and initial medical kit-up.
🔄 Annual Recurring Costs Total: $11.0M/yr
Staff Wages $4.3M/yr
[#4, #5, #7] 24/7 monitoring operations (3 shifts), research team salaries & overhead (RTF-42 core), and tactical/MTF personnel readiness pay, benefits, and overtime.
Long Term Rnd Fund $2.0M/yr
[#24] Ongoing multi-year R&D budget for containment research, experimental hardware testing and theory development.
Research And Monitoring $1.2M/yr
[#8, #9, #14, #21, #23] Detection-network maintenance, data storage & processing bandwidth, biomedical/psych monitoring, satellite imagery subscriptions, and modeling/contractor consulting baseline.
Logistics And Transport $1.1M/yr
[#6, #25] Mobile response vehicle and aircraft contract maintenance/fuel, and per-deployment operational costs averaged annually (airlift, heavy equipment, travel).
Cover Story And Legal $750K/yr
[#16, #17] Retained legal/liaison budget and baseline public-relations / misinformation media buys and cleanup operations.
Insurance And Reserves $500K/yr
[#20] Annual contribution to self-insurance and contingency funds for multi-site incidents and liability.
Sociological Externalities Fund $500K/yr
[#26] Ongoing community monitoring, compensation programs, sociological studies and discreet relocation/mitigation funds.
Facilities Maintenance $240K/yr
[#12, #27] HVAC filters/maintenance, archival integrity checks, and general site maintenance for Site-64 annex.
Supplies And Consumables $185K/yr
[#10, #13, #15] Calibration consumables and calibration contracts, PPE consumables and rotation, sample disposal and routine consumables.
Training And Drills $120K/yr
[#19] Regular live drills, contractor trainers, SOP development, and cross-training exercises.
Power Infrastructure $60K/yr
[#3] Fuel, generator maintenance, and UPS servicing for continuous 24/7 operations.
Communications Security $45K/yr
[#22] Periodic security audits, comms maintenance, and satellite phone/service retainers.
Cost Scenarios
📊 Baseline (baseline) $11.0M/yr
81.0% probability / year
Normal operational year with routine monitoring, scheduled maintenance, and expected number of deployments; no major containment incidents.
no major breaches routine deployments only steady research progress
🚨 Minor Incident $11.5M/yr
15.0% probability / year +$500K vs baseline
One or several localized manifestations requiring additional deployments, replacement of some equipment, and incident-level PR/legal actions.
multiple nearby manifestations equipment damage requiring replacement localized high-visibility incident
🚨 Major Breach $16.0M/yr
3.0% probability / year +$5.0M vs baseline
A sustained/complex manifestation or series of manifestations that damage containment assets and require expanded MTF operations, emergency R&D surge, and significant legal/cover operations.
large or clustered manifestations damage to mobile/containment modules international incident requiring liaison
🚨 Catastrophic Escalation $111.0M/yr
1.0% probability / year +$100.0M vs baseline
Containment proves impossible and manifestations scale geographically and/or in frequency, requiring national/international emergency-level response and massive scaling of resources.
nationwide/geographic spread loss of ability to observe/mitigate Type Black / public exposure event
👥 Personnel 70 total
Role Count Notes
Security Officer / MTF Agent 40 [#7] Tactical/rapid response teams (maintain 2–3 teams on call; 30–50 personnel total).
Research Scientist (senior) 4 [#5] Senior researchers / PIs guiding RTF-42 and experiments (2–4 senior researchers).
Research Scientist (junior / postdoc / analyst) 8 [#5] Postdocs, assistants, analysts for Akiva/EVE study (4–8 junior staff).
Monitoring Senior Researcher 3 [#4] Senior researcher on monitoring console per shift (3 shifts).
Sensor Technician 3 [#4] Sensor tech staffing for monitoring consoles and field sensors (per-shift staffing).
Comms / Operator 3 [#4] Communications operators for monitoring and field coordination (per-shift staffing).
Medical Officer 2 [#14] Small on-site medical unit for monitoring exposed personnel and emergency care.
Engineer / Maintenance 4 [#3, #6, #12, #22] Facility, power, HVAC and mobile asset maintenance and generator/UPS technicians.
Administrative Staff 3 [#16, #27] Site admin, legal liaison, and records/archival staff.