SCP-856
Euclid
~
medium confidence
SCP-856
Expected annual
$1.9M
One-time setup
$2.4M
Annual recurring
$1.9M
Personnel
10
Initial capital outlay is approximately $2.39M, driven mainly by perimeter fencing/civil works and surveillance/power/vehicle equipment. Recurring annual costs are about $1.89M, driven by research staffing, cover-story/legal reserves, contingency set-asides and ongoing maintenance/operations.
One-Time Capital Costs
Total: $2.4M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal year with no major incidents; routine maintenance, research, cover-story payments and reserves funded as usual.
no incidents
routine maintenance
scheduled training and research
🚨
Minor Incident
$2.0M/yr
One or a few small contact incidents requiring medevac, cleanup, ammunition/resupply, localized repairs and increased local payments.
single civilian contact
localized fence damage
medical evacuation and cleanup
🚨
Major Breach
$3.1M/yr
Significant containment breach or drought-related event requiring large-scale emergency response, airlifts, extended armed response and major reconstruction.
large-scale breach
multiple casualties
regional drought or infrastructure failure
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | Primary on-site patrol staff to maintain twice-daily patrols with rotation and leave coverage [#6]. |
| Research Scientist | 1 | PI overseeing SCP-856 biological/behavioral research (part of research program) [#15]. |
| Research Technician | 2 | Technicians supporting field observation, sampling, and lab work included in research program budget [#15]. |
| Engineer / Maintenance | 1 | Responsible for vehicle, boat, sensor and microgrid maintenance and rapid repairs [#8, #11, #12]. |
| Administrative Staff / Project Manager | 1 | Local program manager and administrative support included in overhead [#22]. |
| Local Liaison / Field Coordinator | 1 | Handles cover-story liaison, permits, community payments and local contracting coordination [#17, #14]. |
Confidence Notes
Estimates use midpoints of ranges provided in analyst notes and include contingency reserves; many costs (local hiring, corruption/cover payments, contingency set-asides) are context-sensitive and subject to regional variance, so confidence is moderate.