SCP-864
Safe
~
medium confidence
SCP-864
Expected annual
$1.6M
One-time setup
$1.4M
Annual recurring
$1.6M
Personnel
11
One-time capital costs for retrofitting the chamber, HVAC, waste treatment and equipment are roughly $1.42M; annual baseline operations are about $1.59M/year, driven primarily by personnel, ongoing research grants, and maintenance/consumables.
One-Time Capital Costs
Total: $1.4M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal uneventful year with routine testing and no major containment incidents.
routine testing
no breaches
scheduled research
🚨
Minor Incident
$1.7M/yr
Small containment incident or frequent drone/robot attrition requiring replacement, cleanup and modest legal/PR actions.
drone/robot loss
local contamination event
small hospitalizations or cleanup
🚨
Major Breach
$1.9M/yr
Significant containment breach or medical/legal incident requiring major cleanup, equipment replacement, hospitalizations and expanded secrecy operations.
major subsumption event
staff hospitalization
public exposure requiring obfuscation
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Containment Specialist | 1 | [#9] Senior scientist/lead responsible for approvals and oversight; salary portion of staff_wages. |
| Remote Operator / Technician | 2 | [#9] 24/7 remote manipulators and control-station staff for robotic operations; included in staff_wages. |
| Security Officer / MTF Agent | 4 | [#9, #19] Shift coverage for site security and POI custody; base salaries included in staff_wages (POI custody has additional dedicated recurring costs outside this headcount). |
| Hazmat Technician | 2 | [#7, #9] Trained cleanup and decontamination personnel for responding to incidents; included in staff_wages. |
| Research Scientist | 2 | [#10] On-site researchers (xenobiologist/pathologist/molecular tech) funded through staff_wages; additional grant-funded projects appear in research_and_monitoring. |
Confidence Notes
Line-item ranges provided in analyst notes are broad; many costs (research program scale, incident frequency, and chosen equipment quality) are judgment calls. Core recurring personnel and facility maintenance estimates are better-defined; incident and contingency costs have higher uncertainty.