SCP-865
Safe
~
medium confidence
SCP-865
Expected annual
$674K
One-time setup
$843K
Annual recurring
$671K
Personnel
11
One-time setup and equipment (secure storage, imaging/analysis gear, and contingency reserves) are the main upfront costs (~$843k). Recurring costs are dominated by staff wages and D-class upkeep, producing an expected baseline annual operating budget of ~$671k, with occasional episodic events raising costs substantially.
One-Time Capital Costs
Total: $843K
Annual Recurring Costs
Total: $671K/yr
Cost Scenarios
📊
Baseline
(baseline)
$671K/yr
Normal, uneventful year of routine testing and containment with no major incidents.
routine testing
scheduled maintenance
no external discovery
🚨
Minor Incident
$696K/yr
Localized incident such as equipment damage, a D-class requiring extended medical/psychological care, or need for additional outsourced analyses.
unexpected persistent psychosomatic case
equipment failure/damage
expanded outsourced testing
🚨
Interdiction Event
$921K/yr
Discovery of additional SCP-865-like devices or external MC&D involvement requiring interdiction, legal action, or major cover-up/PR campaign.
public exposure
MC&D trace discovered
external interdiction or litigation
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#12] Armed guards for transfers, test-day security and perimeter control. |
| Research Scientist | 1 | [#13] Lead researcher to design/supervise tests and analyze results. |
| Armorer / Firearms Technician | 1 | [#8] Disassemble, clean and reassemble SCP-865 before/after tests; certification and maintenance. |
| Medical Officer / Paramedic | 1 | [#14, #16] On-site medical support for immediate post-test examination and advanced imaging coordination. |
| Engineer / Maintenance | 1 | [#20, #6] Maintenance, machining/parts fabrication and assistance with imaging/workstation equipment. |
| Administrative Staff | 1 | [#25] IRB-equivalent reviews, ethics oversight, scheduling, and recordkeeping. |
| Class-D Personnel | 4 | [#10, #28] D-class used for testing, housed and managed as recurring program costs. |
Confidence Notes
Estimates are mid-range aggregates derived from analyst ranges and the SCP text. Many line items (outsourced analyses, interdiction/cover-up costs, and frequency of testing) have wide uncertainty, while salaries and basic consumables are better defined; overall confidence is medium.