SCP-866
Euclid
~
medium confidence
SCP-866
Expected annual
$5.0M
One-time setup
$17.3M
Annual recurring
$4.8M
Personnel
25
Initial capital expenditures are approximately $17.3M driven primarily by contingency reserves, decommissioning contingencies, and up-front legal/compensation; annual operating costs are roughly $4.82M/yr driven by large dedicated staffing needs, ongoing research/monitoring, utilities, and legal/cover costs.
One-Time Capital Costs
Total: $17.3M
Annual Recurring Costs
Total: $4.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.8M/yr
Normal uneventful year with routine operations and no major incidents.
normal_operations
scheduled_maintenance
🚨
Minor Incident
$5.1M/yr
Localized incident (partial power disruption, small hardware loss, limited data corruption) requiring emergency repairs and modest legal/operational response.
minor_power_failure
localized_hardware_failure
small_data_loss
🚨
Major Breach
$12.3M/yr
Significant containment failure or attempted power removal causing disappearances, major equipment loss, extended legal exposure and large-scale remediation.
attempted_power_removal
unauthorized_access
large_scale_data_corruption
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#1] Minimum two guards in-room at all times requiring ~8 FTEs to cover shifts, leave and backups. |
| Engineer / Maintenance (Generator Technicians) | 8 | [#2] At least two personnel monitoring diesel backup generators 24/7; ~8 FTEs to staff shifts and backups. |
| Research Scientist | 7 | [#3] Senior research & operations team: 3senior + 4 junior/tech as described. |
| Engineer / IT / System Administrator | 2 | [#4] On-site technical support (1–2 full-time sysadmins/data custodians). |
Confidence Notes
Estimates are based on analyst-provided line items with explicit figures for many categories; major uncertainties remain for power/cooling scaling, contingency reserve sizing and likelihood of severe anomalous events, so confidence is medium.