SCP-8662
Unknown
~
medium confidence
SCP-8662
Expected annual
$321K
One-time setup
$622K
Annual recurring
$301K
Personnel
4
One-time setup (facility retrofit, specialized equipment, incinerator replacement, contingency) ~ $622,000; recurring annual operations (staff, testing, incineration, energy, research, retainers, overhead) ~ $300,563/yr, driven mainly by staff wages, ongoing research, emergency retainer and institutional overhead.
One-Time Capital Costs
Total: $622K
Annual Recurring Costs
Total: $301K/yr
Cost Scenarios
📊
Baseline
(baseline)
$301K/yr
Normal operational year with regular daily removals, routine testing and maintenance, no major incidents.
steady daily removals
no major breaches
incinerator functional / regular waste handling
🚨
Minor Incident
$326K/yr
Small containment lapse or operational spike requiring overtime, temporary contractors, extra disposal and medical checks.
trunk left open / localized breach
temporary regeneration rate increase
overtime and extra incineration
🚨
Research Scale Up
$451K/yr
Duplication rate increases or research priorities require scaling up staff and equipment for containment and study.
accelerating duplication rate
need for expanded lab/testing capacity
procurement of additional containment/disposal
🚨
Major Breach
$801K/yr
Large containment failure with SCP-8662-1 spreading through a wing, requiring major decontamination, structural repairs and prolonged downtime.
containment door left open
incinerator failure during high-throughput removal
SCP-8662-1 spreads into occupied wing
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Level-1 Technician | 2 | [#7] Two FTEs to perform daily removal and containment operations (covers salaries/benefits in staff_wages). |
| Research Scientist | 1 | [#18] Scientific lead for duplication dynamics research (covered within research_and_monitoring recurring budget). |
| Research Technician | 1 | [#18] Lab/technical support for experiments and sampling (covered within research_and_monitoring recurring budget). |
Confidence Notes
Line items are well-delineated with specified ranges, so cost-category mapping is medium-confidence. Major uncertainty remains around SCP duplication dynamics (which affect frequency/severity of incidents) and whether incinerator repair or full replacement is required; contingency and scenario modeling capture this uncertainty.