SCP-8661
Thaumiel
?
low confidence
SCP-8661
Expected annual
$4.3M
One-time setup
$12.8M
Annual recurring
$4.3M
Personnel
23
Initial one-time setup, reserves, and research-related buildout are the main upfront drivers (~$12.8M). Ongoing annual costs are dominated by staff wages (security + research) and cover-story/legal operations, yielding recurring costs of roughly $4.285M/yr.
One-Time Capital Costs
Total: $12.8M
Annual Recurring Costs
Total: $4.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.3M/yr
Normal operational year with no major incidents; routine supervision, maintenance, and scheduled research.
no major incidents
scheduled supervised uses and routine maintenance
🚨
Minor Incident
$4.8M/yr
Single containment/usage incident requiring emergency response, autopsy, cleanup, and PR/legal escalation.
unauthorized or poorly supervised use
single organ-disappearance death requiring external interfaces
🚨
Major Incident
$10.3M/yr
Breach or mass-casualty event (multiple senior-staff losses or public exposure) requiring activation of contingency reserves and large-scale research/response.
site breach or revolt
widespread organ-disappearance deaths
public exposure requiring large-scale cover-up/research
Personnel
23 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 9 | [#3] Nine guards to provide 24/7 coverage (3 guards/shift × 3 shifts). |
| Security Supervisor | 1 | [#3] Shift supervisor / on-call rapid response lead. |
| Research Scientist | 6 | [#11] Core anomalous research team studying mechanism and mitigation. |
| Laboratory Technician | 4 | [#11] Tech support for research, monitoring, and lab work. |
| Legal / Ethics Staff | 2 | [#14] Legal and ethics officers for policy review, tribunals, and liability management. |
| Administrative Staff / Executive Support | 1 | [#24] Administrative support for O5 coordination and oversight. |
Confidence Notes
Anomalous science (timing of perceptual years, fatality frequency), variable incident rates, and wide ranges in analyst estimates make precise costing uncertain; contingency/reserve choices drive large swings.