SCP-872
Expected annual
$1.6M
One-time setup
$2.2M
Annual recurring
$1.6M
Personnel
15
One-time startup costs depend on whether land must be acquired; expected one-time range ~$200k–$3M with main drivers being land and heavy perimeter build-out. Recurring annual costs driven by security staffing, carcass disposal and veterinary/medical readiness; baseline recurring budget ~ $1.6M/yr.
One-Time Capital Costs
Total: $2.2M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal uneventful year with routine observations and no major incidents.
regular monthly observations
no perimeter breaches
routine maintenance
🚨
Minor Incident
$1.7M/yr
Localized perimeter breach or increased animal aggression requiring overtime response, additional carcass disposal and legal/compensation.
small-scale livestock incursion
medical treatment / minor property damage
short-term surge staffing
🚨
Major Breach
$2.6M/yr
Significant containment failure or rapid spread of affected animals requiring large-scale neutralization, heavy equipment, aerial operations and extensive cleanup.
widespread animal spread outside buffer
multiple simultaneous breaches
need for large-scale culling/quarantine
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 9 | [#5] Nine guards to cover 24/7 rotations (3 per shift). |
| Site Supervisor | 1 | [#5] On-site supervisory position for daily operations and incident command. |
| Research Scientist | 2 | [#13] Two FTE researchers for sample analysis and observation events. |
| Veterinarian / Animal Specialist | 1 | [#10] On-call/vetted veterinarian for assessments and humane handling. |
| Site Director / Program Manager | 1 | [#21] Program manager responsible for budgeting, liaison and oversight. |
| Administrative Staff | 1 | [#21] Administrative support for records, travel, and clearance processing. |
Confidence Notes