SCP-8747
Unknown
?
low confidence
SCP-8747
Expected annual
$814.1M
One-time setup
$6.2B
Annual recurring
$755.5M
Personnel
102
Upfront capital and R&D are the dominant costs (one-time ~6.19B, largely driven by eigenmachine reconstruction and a reserved full-scale amnestic mobilization). Ongoing annual costs are substantial (~755M/year) driven primarily by global disinformation/PR, ISP indemnities, R&D/monitoring, and specialized staffing.
One-Time Capital Costs
Total: $6.2B
Annual Recurring Costs
Total: $755.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$755.5M/yr
Normal year with ongoing containment operations and no major incidents.
standard_operations
no_major_breach
🚨
Minor Incident
$773.5M/yr
Localized breach or persistence event requiring emergency destruction, targeted indemnities, and short-term surge response.
localized_data_persistence
emergency_physical_destruction
🚨
Major Breach
$1.3B/yr
Widespread containment failure requiring large indemnities, accelerated R&D and large-scale public mitigation.
widespread_persistent_anomalous_data
multi-jurisdictional_impacts
🚨
Catastrophic Amnestic Rollout
$6.8B/yr
LV-Class 'Broken Masquerade' requiring full-scale global amnestic mobilization and massive remediation/compensation.
global_masquerade_breach
mass_administration_of_amnestics
Personnel
102 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 45 | [#2] 24/7 on-site security staffing including quick reaction forces and K9 units; headcount chosen within 30–60 range. |
| Research Scientist | 27 | [#3] Highly-cleared senior specialists (conceptual engineers, memeticists, cryptographers, analog engineers). |
| Cybersecurity Engineer / Network Ops | 16 | [#4] Engineers coordinating BGP/IP blocking, sinkholing, and ISP coordination. |
| Administrative Staff | 10 | [#11] Managers, program administrators, logistics and liaison support. |
| Security Supervisor / Management | 3 | [#2] Supervisory/security management positions (shift leads, security managers). |
| Site Director / Executive Staff | 1 | [#1] Site-level director/executive oversight for the specialized facility. |
Confidence Notes
Estimates are based on wide ranges and many uncertain, anomalous operational choices (e.g., scope of ISP contracts, scale of PR campaigns, probability of LV scenarios). The underlying phenomenon is poorly constrained, so cost estimates have low confidence.