SCP-875
Safe
~
medium confidence
SCP-875
Expected annual
$11.0M
One-time setup
$23.5M
Annual recurring
$10.8M
Personnel
64
Upfront capital expenditures are approximately $23.5M driven by site stabilization, specialized containment/engineering repairs and a conditional off-site upgrade; recurring annual costs are roughly $10.85M driven primarily by staffing, contingency/rapid-response funds and cover/opsec operations.
One-Time Capital Costs
Total: $23.5M
Annual Recurring Costs
Total: $10.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$10.8M/yr
Normal operational year with no major incidents; containment and monitoring function as designed.
no breaches
routine maintenance
standard research activity
🚨
Minor Incident
$11.8M/yr
Localized activation/swarm release or limited specimen activation requiring emergency medical response, temporary repairs and possible specimen transport.
SCP-875-1 swarm release
minor stasis failure
limited structural damage
🚨
Major Breach
$15.8M/yr
Significant reactor/stasis breach requiring full evacuation, emergency repairs, large-scale containment effort and heavy asset deployment.
reactor compromise
multiple stasis failures
widespread structural/explosive damage
🚨
Political Exposure
$13.8M/yr
Discovery or high-level foreign/state surveillance exposure requiring extensive OPSEC, bribery, legal action and potential nation-state-level operations.
unauthorized satellite imagery
civilian disappearances reported
nation-state involvement
Personnel
64 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 36 | [#3] 36 full-time guards (3 shifts of 12) at ~$60,000/year loaded cost per guard. |
| Reactor Technician / Engineer | 18 | [#4] 18 technicians to provide six on-duty continuously (8-hour shifts) at ~$95,000/year loaded cost. |
| Medical Staff | 10 | [#5] ~9 medical staff for shift coverage plus one trauma surgeon on-call (staff wages estimated at ~$930,000/yr total). |
Confidence Notes
Many line items are rough analyst estimates and several costs are conditional (off-site build-outs, specimen containment choices, nation-state OPSEC). Personnel counts and specialist wage rates are explicit, but capital and contingency items have wider uncertainty ranges.