SCP-8760
Unknown
~
medium confidence
SCP-8760
Expected annual
$18.2M
One-time setup
$30.3M
Annual recurring
$16.1M
Personnel
63
Initial capital costs are approximately $30.33M driven by specialised containment, shielding, cryogenic and vault construction; recurring operations are ~ $16.14M/yr driven by staff wages, specialized fuel procurement, long-term research and maintenance.
One-Time Capital Costs
Total: $30.3M
Annual Recurring Costs
Total: $16.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$16.1M/yr
Normal operational year with scheduled research, maintenance, routine waste handling and no major incidents.
routine_operations
scheduled_research
no significant incidents
🚨
Minor Incident
$18.1M/yr
Localized equipment failure or small radiological release requiring emergency response, repairs and limited remediation.
unauthorized activation
small containment breach
equipment failure
🚨
Major Breach
$41.1M/yr
Significant containment failure or meltdown event causing structural damage, casualties and multi-month remediation.
structural failure
large radiological release
unauthorised personnel actions
🚨
Catastrophic Breach
$216.1M/yr
Full uncontrolled fission/‘supernova-like’ end-state or catastrophic environmental release requiring large-scale remediation and possible site abandonment.
uncontrolled fission cascade
site-level structural collapse
large-scale environmental contamination
Personnel
63 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 18 | [#9] Nu-7 detachment for 24/7 rotational coverage; loaded cost included in staff_wages. |
| Site Security Guard | 9 | [#10] Supplementary security cadre to handle restricted-access wing; salaries included in staff_wages. |
| Research Scientist | 9 | [#17] Senior scientists and postdocs working on nuclear physics/materials; salaries included in staff_wages. |
| Technician / Engineer | 18 | [#11, #3, #5, #25] Shift technicians and engineers (mechanical, cryo, electrical, maintenance) for operations and remote-systems support. |
| Medical Officer / Radiological Specialist | 2 | [#15, #16] On-call radiological medical support and hot-lab medical supervision; medical services recurring costs accounted separately. |
| Administrative Staff | 4 | [#25, #23] Admin, logistics and procurement staff to manage supplies, licensing and covert procurement overhead. |
| IT / Data Engineer | 2 | [#27, #18] Secure telemetry, data storage and analysis support for instrumentation. |
| Site Director / Executive Staff | 1 | [#25] Executive oversight and liaison; included in staff_wages estimate. |
Confidence Notes
Analyst notes provide detailed line items allowing mid-range estimates, but high-end nuclear-materials risks, uncertain fuel needs, and low-frequency catastrophic outcomes produce significant uncertainty in upper-bound costs.