SCP-8762
thaumiel
~
medium confidence
SCP-8762
Expected annual
$1.3M
One-time setup
$4.9M
Annual recurring
$1.2M
Personnel
16
Upfront capital and integration costs (~$4.9M) are driven by site integration, specialized research lab access, and redundancy; annual operating costs are roughly $1.24M/yr (security, research, medical) with potential offsets if SCP-8762 reduces containment needs elsewhere.
One-Time Capital Costs
Total: $4.9M
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal uneventful year with routine operations, no major incidents.
routine_operations
no_incidents
🚨
Minor Incident
$1.5M/yr
Localized medical emergency or attempted sedation requiring emergency reversal and temporary relocation/response.
accidental_sedation
localized_breach
emergency_medical_response
🚨
Major Breach
$3.7M/yr
Significant targeted attack or containment failure requiring large-scale response, replacement/resiting, and major covert/legal operations.
targeted_kidnapping_or_sabotage
catastrophic_containment_failure
large_scale_amnestization_and_repairs
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#3] Dedicated guard rotations (6–8 recommended for 24/7 coverage); 8 assumed to ensure continuous coverage. |
| Research Scientist | 3 | [#4] 2–4 full-time researchers/technicians; 3 assumed mid-range. |
| Medical Officer | 1 | [#5] Full-time nurse/med-tech on-site; physician retained on-call (contract). |
| Psychologist / Activity Coordinator | 2 | [#6] Psychologist and activity/morale coordinator to manage approved stimuli and behavior. |
| Engineer / Maintenance | 1 | [#18, #10] On-site technical/maintenance support for monitoring systems, UPS, and backup containment readiness. |
| Administrative Staff | 1 | [#20] Coordination and scheduling for co-location among anomalies; admin overhead. |
Confidence Notes
Analyst notes provide granular line items and ranges, enabling a mid-confidence estimate; wide ranges on site-integration, R&D, and offsets introduce material uncertainty (especially offsets which could dramatically change net costs).