SCP-8811
Unknown
?
low confidence
SCP-8811
Expected annual
$4.4M
One-time setup
$20.5M
Annual recurring
$4.3M
Personnel
32
Estimated one-time setup of roughly $20.5M driven primarily by island site construction, stabilization, and vault/setup costs; recurring annual operations about $4.3M driven by staff wages, security, maintenance, and rapid-response retainers.
One-Time Capital Costs
Total: $20.5M
Annual Recurring Costs
Total: $4.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.3M/yr
Normal year with routine operations, no major incidents.
routine maintenance
scheduled research cycles
standard resupply
🚨
Minor Incident
$4.5M/yr
Minor containment or site incident requiring local repairs, limited medical response, and short-term overtime.
localized structural damage
small-scale breach
equipment failure
🚨
Major Breach
$5.8M/yr
Major containment breach or anomalous escalation requiring emergency salvage, extensive repairs, external contractors and legal action.
containment breach
significant artifact/humanoid relocation
external emergency response
🚨
Relocation Operation Scenario
$5.0M/yr
Planned or emergency relocation of SCP-8811-A/B or large artifacts off-island to a secure Foundation facility.
decision to relocate
escalating risk to locals
vault consolidation
Personnel
32 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | 24/7 manned security (12 guards across 3 shifts + 2 shift supervisors) and periodic armed response. |
| Containment Specialist / Field Team | 6 | Specialized containment personnel, medics and restraint teams (4–6 specialists noted). |
| Research Scientist | 6 | Archaeologists, conservators, linguists and historians (onsite rotating field seasons; 6–10 estimated). |
| Medical Officer | 2 | Onsite medical staff for daily care and emergency response. |
| Conservator / Lab Technician | 1 | Specialist conservator/technician to manage artifact treatment, scanning and lab equipment. |
| Administrative Staff / Site Manager | 1 | Site director/administrative support for permits, logistics and liaison with central ops. |
| Cultural Liaison / Translator | 2 | Translators, papyrologists and cultural/ethical liaison contractors for ongoing translation and oversight. |
Confidence Notes
Estimates are order-of-magnitude with many wide ranges in the analyst notes; the object's anomalous properties and unknown containment complexity increase uncertainty.