SCP-8812 Euclid ? low confidence
SCP-8812
Expected annual
$4.0M
One-time setup
$12.6M
Annual recurring
$3.9M
Personnel
30
One-time capital costs are dominated by specialized equipment, drilling/extraction contingencies, and facility setup (~$12.6M total). Recurring annual costs (staffing, maintenance, research, and lifecycle replacement) are roughly $3.86M/yr, with staff wages and ongoing research/monitoring as the primary drivers.
🏗️ One-Time Capital Costs Total: $12.6M
Extraction Retrieval Operation $5.0M
[#29] Contingent one-off cost for a planned extraction/retrieval operation (heavy-lift, custom retrieval tooling, extended specialist deployment); very large variance depending on chosen method.
Equipment $2.3M
[#4, #5, #6, #11, #12, #13, #20] Purchase and R&D for micro-ROVs and custom housings, procurement of a work-class ROV system and TMS, long-length tether reels and winches, generator and power hardware, initial continuous monitoring sensor arrays (cameras/hydrophones/tension sensors), secure communications hardware, and initial spare-parts inventory.
Directional Drilling $2.0M
[#8] Optional controlled borehole / directional drilling to 750+ m depth (rig mobilization, drilling, casing, geology surveys, contingency). High variance depending on geology and approach.
Initial Research And Lab Setup $1.0M
[#17, #18] Initial engineering studies, modeling and small-scale testing; BSL-capable sample handling / pathology lab fit-out and initial scientific instrumentation for analysis.
Facilities $700K
[#2, #7, #9, #10] Perimeter setup, motor clamp engineering/installation, civil works (roads/helipad/staging), and initial field camp/operations shelter setup. Includes fencing/anti-tamper, structural installation of clamp/motor works and basic camp construction.
Public Relations And Incident Fund $500K
[#24] One-time contingency reserve for blackout/incident response, local remediation, or controlled payouts in the event of leaks/exposure.
Insurance And Risk Reserve Initial $500K
[#26] Initial internal contingency/reserve to cover catastrophic incidents or unforeseen replacements.
Site Acquisition And Permitting $300K
[#1] Legal control/lease/expropriation negotiations, permits, legal counsel, and one-time payments or covert payments to local authorities/landowners.
Logistics Initial $150K
[#21] Initial mobilization, international transport of heavy equipment, customs handling, and airfreight/crating costs to establish site operations.
Medical Equipment And Training $100K
[#16] One-time purchase of onsite medical equipment, emergency kits, and initial specialized training related to remote-site medevac/emergency response.
Legal Diplomatic Initial $100K
[#23] Initial legal counsel, cover-story setup costs, local liaison onboarding, and diplomatic risk mitigation startup costs.
🔄 Annual Recurring Costs Total: $3.9M/yr
Staff Wages $1.8M/yr
[#3, #14, #15] 24/7 security rotations and guards, scientific staff (physiologists, marine engineers, geologists, anomalous researchers), and technical staff (ROV pilots, mechanics, electricians, IT).
Research And Monitoring $780K/yr
[#17, #18, #25, #27, #28] Ongoing engineering modeling and updates, lab operations and pathology work, environmental monitoring of groundwater, archival/reporting/oversight administrative costs, and a modest multi-discipline long-term research program.
Facilities Maintenance $255K/yr
[#2, #9, #10, #11] Perimeter and site maintenance, camp utilities and upkeep, helipad/road maintenance, and generator maintenance / fuel logistics (ongoing).
Lifecycle Replacement Fund $250K/yr
[#30] Annualized lifecycle and major refresh fund (budgeting for 20–50% of initial capital per decade, expressed as ~2–5%/yr of initial capital).
Rov Maintenance And Repairs $200K/yr
[#4, #5, #6, #20] Annual repairs, pressure-testing, spare parts, and servicing for micro-ROVs, work-class ROVs, tether systems, and winches.
Insurance And Risk Replenish $200K/yr
[#26] Annual replenishment/top-up of the internal risk reserve to prepare for escalations and large replacements.
Supplies And Consumables $154K/yr
[#12, #13, #19, #20] Data charges and telemetry costs, communications bandwidth, corrosion control consumables and replacements, and routine spare-part/battery replenishment.
Logistics And Transport $60K/yr
[#21] Yearly transport for rotations, international shipping cycles, customs recurring costs, and mobilization for specialist deployments.
Cover Story And Legal $60K/yr
[#23] Ongoing legal counsel, local liaison costs, covert cover-story maintenance, and political risk mitigation.
Medical Readiness $60K/yr
[#16] Medevac contract standby costs, refresher medical training, and replenishment of emergency medical supplies.
Training Drills $40K/yr
[#22] Regular training exercises for staff and guards, safety drills, and ROV operation refresher courses.
Cost Scenarios
📊 Baseline (baseline) $3.9M/yr
78.0% probability / year
Normal operations year with routine monitoring, maintenance, research, and no major incidents.
normal_operations scheduled_maintenance routine_research
🚨 Minor Incident $4.3M/yr
20.0% probability / year +$400K vs baseline
Localized equipment failure or minor containment incident requiring emergency response, ROV replacement, and limited PR/mitigation.
ROV_loss equipment_failure localized_containment_response
🚨 Extraction Attempt $8.9M/yr
2.0% probability / year +$5.0M vs baseline
Decision to perform a full extraction/retrieval operation (heavy-lift, drilling or large intervention).
decision_to_extract major_intervention drilling_and_heavy_lift
👥 Personnel 30 total
Role Count Notes
Security Officer / MTF Agent 12 [#3] 24/7 guard rotations with redundancy to secure remote site.
Research Scientist 6 [#14] Physiologists, marine engineers, geologists, and anomalous researchers (rotating specialists).
Technical Staff (ROV pilots, mechanics, electricians, IT) 8 [#15] Operators and maintenance personnel for ROVs, winches, power and IT systems.
Medical Officer 1 [#16] Onsite medical readiness and coordination with medevac contractors.
Site Director / Executive Staff 1 [#14, #23] Senior onsite management and liaison with higher Foundation levels.
Administrative Staff 2 [#21, #27] Logistics, customs handling, archival/reporting and site admin.
📋 Confidence Notes
Wide technical, geological, and political uncertainties in the source material produce high variance in single-item costs (drilling, extraction, covert payments). Many line items have multi-order-of-magnitude ranges and unknown likelihoods, so overall cost estimates are approximate.
← SCP-8811 ↑ All SCPs SCP-8813 →