SCP-8815
Unknown
~
medium confidence
SCP-8815
Expected annual
$19.6M
One-time setup
$621.4M
Annual recurring
$14.6M
Personnel
7
One-time infrastructure and potential mission costs dominate (estimated ~$621M one-time for all contingency missions listed), while baseline operations including staff, storage, security and communications run ~ $14.6M per year; main drivers are space-mission escalation (orbiter/relay/lander) and core recurring staffing, observatory access, and mission ops.
One-Time Capital Costs
Total: $621.4M
Annual Recurring Costs
Total: $14.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$14.6M/yr
Normal year: routine daily monitoring and analysis with no major incidents or mission escalations.
daily_recordings
routine_analysis
no major incidents
🚨
Minor Incident
$15.2M/yr
Localized incident: data leak, minor tampering, or PR/legal incident requiring incident response, emergency observations, and contractor work.
data_leak
unauthorized_access
viral media attention
🚨
Orbital Localization
$139.6M/yr
Decision to fund and launch a reconnaissance lunar orbiter to localize the source; includes spacecraft procurement and first-year ops.
insufficient Earth-based localization
scientific/political decision to escalate
🚨
Surface Response
$499.6M/yr
Full surface response/containment mission (lander/rover) possibly combined with relay infrastructure and quarantine prep.
confirmed localized source requiring retrieval
evidence of biological hazard or high-value asset
Personnel
7 total
| Role | Count | Notes |
|---|---|---|
| Site Director / PI (Research Scientist) | 1 | [#5] Principal Investigator / project lead salary included in staff_wages. |
| Signal Analyst | 2 | [#5] Two signal analysts for capture and processing operations. |
| Linguist | 1 | [#5] Linguistics/speech analysis support. |
| Engineer / System Administrator | 1 | [#5] RF engineer / systems admin for receivers and processing systems. |
| Administrative Staff | 1 | [#5] Project administrative and coordination support. |
| Security Officer / Guard | 1 | [#8] Onsite security staff for ground station/hardware protection (recurring security_staff cost). |
Confidence Notes
Analyst notes provide detailed line items and ranges for equipment, staffing, and mission costs, enabling mid-confidence estimates for recurring operations; large-space-mission costs and probabilities are inherently uncertain, lowering overall confidence to medium.