SCP-8905
Safe
~
medium confidence
SCP-8905
Expected annual
$2.3M
One-time setup
$2.6M
Annual recurring
$2.1M
Personnel
11
One-time capital costs are dominated by containment upgrades, specialized equipment and contingency reserves (~$2.62M total); recurring annual costs (security, on-call teams, R&D and overhead) are roughly $2.14M/year, driven primarily by staffing and an active research program.
One-Time Capital Costs
Total: $2.6M
Annual Recurring Costs
Total: $2.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.1M/yr
Normal year with active containment, ongoing monitoring and the regular research program in place; no major incidents or upgrades.
no_major_incident
routine_operations
ongoing_research
🚨
Minor Incident
$2.2M/yr
Small containment incident or failed experiment causing overtime, extra security presence, limited repairs, and short-term investigations.
failed_experiment
unauthorized_access
localized_equipment_damage
🚨
Research Scale Up
$3.0M/yr
Decision to aggressively scale R&D (larger team, extended experiments, additional rented facilities/equipment) to attempt opening/defeating the lock.
funding_approval_for_large_R&D
priority_directive_to_open_lock
successful_grant_of_special_resources
🚨
Containment Upgrade Required
$3.1M/yr
Opening or discovery of hazardous/novel contents forces immediate major containment upgrades (Keter-level chamber, airlocks, negative-pressure systems).
discovery_of_hazardous_contents
classification_upgrade_needed
external_threats_from_contents
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#2] Six guards (2 per shift × 3 shifts) plus supervisory coverage; included in staff wage estimates. |
| Containment Technician | 2 | [#3] Two containment technicians as part of the dedicated on-call containment/response team. |
| Engineer / Maintenance | 1 | [#3] One on-call engineer included in the dedicated response team wages. |
| Research Scientist | 1 | [#3] One senior researcher on-call (additional researchers for long-term R&D are budgeted under research_and_monitoring, not in staff_wages breakdown). |
Confidence Notes
Analyst notes provide detailed line items and ranges for nearly every cost; however several high-variance items (containment upgrades, long-term R&D scale and legal/cover costs) have wide ranges, so totals are moderately uncertain.