SCP-8908
Euclid
~
medium confidence
SCP-8908
Expected annual
$1.4M
One-time setup
$2.6M
Annual recurring
$1.3M
Personnel
13
One-time setup (property, equipment, robotics, containment reserves) is on the order of several hundred thousand to a few million USD; recurring annual operations are ~USD 1.34M/year driven mainly by staff wages (security, researchers, remote operators, medical) and ongoing research, monitoring, and maintenance.
One-Time Capital Costs
Total: $2.6M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal year with routine operations, monitoring, maintenance, training, and ongoing research with no major incidents.
no_incidents
regular_operations
scheduled_maintenance
🚨
Minor Incident
$1.5M/yr
A contained personnel injury or localized containment event requiring medical treatment, prosthetics, limited specialist mobilization, and equipment repair.
severe_injury
medical_rehabilitation
limited_recovery_operations
🚨
Major Breach
$3.0M/yr
A major containment failure or discovery necessitating emergency demolition/neutralization, deployment of outside specialists, large legal/PR response, and use of containment reserve.
containment_breach
forced_demolition
major_public_exposure
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | Six guards to cover three 8-hour shifts; wages included in staff_wages. [#7] |
| Security Supervisor | 1 | Supervisor for shift coordination and liaison; wages included in staff_wages. [#7] |
| Remote Monitoring Operator | 2 | Analysts/operators for 24/7 feed monitoring and logging; wages included in staff_wages. [#8] |
| Research Scientist | 3 | On-site/rotating entry researchers (2–4 recommended; mid-range used). Wages included in staff_wages. [#9, #21] |
| Medical Officer | 1 | On-call medic/contractor for trauma response; wages included in staff_wages. [#10] |
Confidence Notes
Analyst notes provide detailed line-item ranges, enabling order-of-magnitude estimates; uncertainty remains due to purchase-vs-lease choice, local cost variability, and low-frequency high-cost incident probabilities.