SCP-9010
Safe
~
medium confidence
SCP-9010
Expected annual
$2.0M
One-time setup
$4.1M
Annual recurring
$2.0M
Personnel
15
One-time setup and contingency seed reserve dominate initial costs (~$4.06M), while recurring annual costs are driven by staffed 24/7 monitoring, security, research programs and redundant systems (~$2.00M/yr).
One-Time Capital Costs
Total: $4.1M
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Uneventful year with no major incidents; routine monitoring, maintenance, research and OPSEC activities only.
normal_operations
scheduled_maintenance
routine_research
🚨
Minor Incident
$2.2M/yr
Localized equipment failure, single unobserved entry quickly detected and contained, requiring overtime, repairs and limited medical/research costs.
sensor_failure
single_unobserved_entry
limited_equipment_damage
🚨
Major Breach
$3.5M/yr
Significant containment failure or repeated unobserved entries requiring emergency construction, major equipment replacement, extended medical care and PR/legal response.
multiple_unobserved_entries
structural_expansion
major_equipment_loss
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Surveillance Operator / Monitoring Staff | 6 | [#4] Three-shift coverage with 2 monitors per shift (watch + supervisor); fully burdened wages included in staff_wages. |
| Security Officer / Armed Guard | 5 | [#5] Dedicated on-site security detail (4-6 guards rotated); costs included in staff_wages. |
| Research Scientist / Assigned Researchers | 3 | [#6] 2-3 full/part-time researchers (physicist/architectural specialist, anomaly officer, engineer); wages included in staff_wages. |
| Medical Officer / On-call Medical Tech | 1 | [#10] On-call medical/triage technician for post-entry treatment and quarantine; staffing cost included in staff_wages. |
Confidence Notes
Analyst notes provide detailed line-item ranges and operational requirements, enabling a medium-confidence estimate; uncertainty remains due to anomalous/non-Euclidean behavior and the potential for unpredictable incidents which could materially change costs.