SCP-906
Euclid
~
medium confidence
SCP-906
Expected annual
$2.2M
One-time setup
$3.9M
Annual recurring
$2.1M
Personnel
18
Initial capital costs are approximately $3.86M driven primarily by fabrication/installation of the titanium containment, capital reserves, and research fit-out; ongoing annual costs are about $2.10M driven by staff wages, feeding/logistics, contingency reserves and research operations.
One-Time Capital Costs
Total: $3.9M
Annual Recurring Costs
Total: $2.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.1M/yr
Normal operational year with no containment incidents; scheduled maintenance, feeding, research, and reserve replenishments proceed as planned.
routine maintenance
scheduled research activity
regular supply deliveries
🚨
Minor Incident
$2.3M/yr
Localized corrosion or spill requiring emergency repairs, overtime response, limited medical treatment and small PR/legal actions.
localized containment breach
small medical exposure
urgent patching/part replacement
🚨
Major Breach
$3.6M/yr
Significant containment failure or extensive corrosion requiring large-scale repair/replacement, major medical response, PR/legal action and surge research.
major enclosure corrosion/failure
widespread exposure or public incident
need for full or partial re-fabrication
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#8] On-site guards for escort, lockdown and immediate response; costed as 8 FTEs in staff_wages. |
| Security / CCTV Operator | 6 | [#7] Monitoring operators to provide 24/7 coverage; costed as 6 FTEs in staff_wages. |
| Research Scientist | 3 | [#20] Research staff (2–3 researchers + tech support) included in staff_wages for ongoing study of SCP behavior and countermeasures. |
| Engineer / Maintenance | 1 | [#18] Technician(s) performing bi-weekly maintenance/inspections and immediate repairs; labor component included in staff_wages. |
Confidence Notes
Line-item detail and midrange estimates are available, but large uncertainty remains around titanium fabrication costs by region, the secretion's unknown effects on materials, and staffing model choices; these drive medium confidence.